Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 11/7/2019 PERMIT SUB-TYPE: SNEW PERMIT NO: B19-04579
JOB ADDRESS:
2228 PACKING IRON DR
FRISCO, TX 75036
DESC:   4146 AC, 5073 SF, 2 STORY
OWNER:
CALATLANTIC HOMES OF TEXAS INC

IRVING TX 75063-8050

CONTRACTOR:
LENNAR HOMES
1707 MARKETPLACE BLVD, STE. 100
IRVING TX 75063
ISSUED DATE:
11/7/2019
APPLIED DATE:
10/15/2019
EXPIRED DATE:
12/9/2020
SITE APN:
ADD136812
STATUS:
COMPLETED
APPLICANT:
LENNAR HOMES
1707 MARKETPLACE BLVD, STE. 100
IRVING TX 75063
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
0
FEE SUMMARY
INSPECTION SUMMARY
1 INCH PD METER$435.00
WATER METER DEPOSIT$125.00
REPLACE DAMAGED/UNREADABLE REGISTER$500.00
CREDIT CARD FEE$164.58
CREDIT CARD FEE$1.80
CREDIT CARD FEE$1.20
CREDIT CARD FEE$2.40
CREDIT CARD FEE$10.00
2NDS AND FRAMING 02/26/2020 JDR$30.00
2NDS AND FRAMING 03/03/2020 JDR$30.00
ELECT FINAL RES 04/15/2020 JDR$30.00
ELECT FINAL RES 04/17/2020 JDR$30.00
RESIDENTIAL BUILDING PERMIT FEE$2,031.90
FENCE FEE$20.00
RESIDENTIAL FEE$152.19
RESIDENTIAL MECHANICAL FEE$146.00
RESIDENTIAL PLUMBING FEE$291.00
THOROUGHFARE IMPACT FEE$3,816.00
WATER IMPACT FEE$1,772.00
SEWER IMPACT FEE$0.00
UTILITIES INSPECTION 05/22/2020 NMN$90.00
PLUMB MECH FINAL 05/01/2020 SDC$30.00
2NDS AND FRAMING 02/28/2020 TWC$30.00
Total Fees:$9,739.07
______  METER PAYMENT
______  T-POLE RES
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  SLAB RES
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  INSULATION RES
______  DRYWALL RES
______  BRICKWALL TIES RES
______  ELECT FINAL RES
______  ELECT FINAL RES
______  ELECT FINAL RES
______  FLATWORK RES
______  ELECT FINAL RES
______  PLUMB MECH FINAL
______  GAS RELEASE
______  PLUMB MECH FINAL
______  PLUMB MECH FINAL
______  PLUMB MECH FINAL
______  UTILITIES INSPECTION
______  WATER REGISTER
______  UTILITIES INSPECTION
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)