|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 8/27/2019
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B19-03690
|
JOB ADDRESS: 16510 LUPINE RD FRISCO, TX |
DESC:
3518 AC 4272 SF 2 STORY |
|
OWNER:
NASH ELAND LLC
C/O NEWLAND REAL ESTATE GROUP LLC SAN DIEGO CA 92121-1970
|
CONTRACTOR:
TSHH, LLC
PLANO TX 75093
|
ISSUED DATE: 8/27/2019
APPLIED DATE:8/12/2019
EXPIRED DATE:9/12/2020
SITE APN:D730437
STATUS:COMPLETED
|
|
APPLICANT:
TSHH, LLC
PLANO TX 75093
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
PLUMB MECH FINAL 03/02/2020 CCM | $30.00 |
PLAN REVIEW FEE | $50.00 |
RESIDENTIAL BUILDING PERMIT FEE | $1,782.04 |
FENCE FEE | $20.00 |
RESIDENTIAL FEE | $128.16 |
RESIDENTIAL MECHANICAL FEE | $139.50 |
RESIDENTIAL PLUMBING FEE | $249.00 |
WATER IMPACT FEE | $387.00 |
SEWER IMPACT FEE | $1,619.00 |
CREDIT CARD FEE | $87.49 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $3.00 |
CREDIT CARD FEE | $2.40 |
CREDIT CARD FEE | $1.80 |
1 INCH PD METER | $435.00 |
WATER METER DEPOSIT | $125.00 |
PTO AND MECH ROUGH 11/15/2019 MLM | $30.00 |
UTILITIES INSPECTION 02/24/2020 NMN | $90.00 |
UTILITIES INSPECTION 02/28/2020 NMN | $90.00 |
UTILITIES INSPECTION 03/05/2020 NMN | $90.00 |
ELECT FINAL RES 01/27/2020 RWT | $30.00 |
GAS RELEASE 01/27/2020 SDC | $30.00 |
Total Fees: | $5,419.99 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ BRICKWALL TIES RES |
______ INSULATION RES |
______ DRYWALL RES |
______ DRYWALL RES |
______ FLATWORK RES |
______ GAS RELEASE |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|