|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 7/29/2019
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B19-03270
|
JOB ADDRESS: 14236 MASON RIVER RD FRISCO, TX 75035 |
DESC:
3445 AC, 4462 SF, SFR / 1 STORY |
|
OWNER:
CAMBRIDGE HOMES LLC
PLANO TX 75024-3677
|
CONTRACTOR:
CAMBRIDGE HOMES HOLDINGS, LLC IKA TEGRIT
FRISCO TX 75034
|
ISSUED DATE: 7/31/2019
APPLIED DATE:7/11/2019
EXPIRED DATE:9/2/2020
SITE APN:C963327
STATUS:COMPLETED
|
|
APPLICANT:
CAMBRIDGE HOMES HOLDINGS, LLC IKA TEGRIT
FRISCO TX 75034
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
CREDIT CARD FEE | $2.20 |
T-POLE RES 10/14/2019 WND | $30.00 |
SET 1 PD METER 10/14/2019 CAW2 | $80.00 |
CREDIT CARD FEE | $11.20 |
WATER METER DEPOSIT | $125.00 |
1 INCH PD METER | $435.00 |
SEWER IMPACT FEE | $1,350.00 |
WATER IMPACT FEE | $1,315.00 |
THOROUGHFARE IMPACT FEE | $1,510.00 |
RESIDENTIAL PLUMBING FEE | $212.00 |
RESIDENTIAL MECHANICAL FEE | $113.00 |
RESIDENTIAL FEE | $133.86 |
FENCE FEE | $20.00 |
RESIDENTIAL BUILDING PERMIT FEE | $1,842.84 |
Total Fees: | $7,180.10 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE RES |
______ SET 1 PD METER |
______ T-POLE RES |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ INSULATION RES |
______ BRICKWALL TIES RES |
______ DRYWALL RES |
______ FLATWORK RES |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ PLUMB MECH FINAL |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|