Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 7/9/2019 PERMIT SUB-TYPE: SNEW PERMIT NO: B19-02994
JOB ADDRESS:
2651 EUCALYPTUS RD
FRISCO, TX
DESC:   3645 AC, 4850 SF, SFR / 2 STORY
OWNER:
NASH ELAND LLC
C/O NEWLAND REAL ESTATE GROUP LLC
SAN DIEGO CA 92121-1970

CONTRACTOR:
M/I HOMES

LEWISVILLE TX 75067
ISSUED DATE:
7/18/2019
APPLIED DATE:
6/21/2019
EXPIRED DATE:
8/25/2020
SITE APN:
D730567
STATUS:
COMPLETED
APPLICANT:
M/I HOMES

LEWISVILLE TX 75067
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
0
FEE SUMMARY
INSPECTION SUMMARY
1 INCH PD METER$435.00
WATER METER DEPOSIT$125.00
REPLACE DAMAGED/UNREADABLE REGISTER$500.00
RESIDENTIAL BUILDING PERMIT FEE$1,910.80
FENCE FEE$20.00
RESIDENTIAL FEE$140.40
RESIDENTIAL MECHANICAL FEE$139.50
RESIDENTIAL PLUMBING FEE$249.00
WATER IMPACT FEE$464.00
SEWER IMPACT FEE$1,619.00
CREDIT CARD FEE$1.80
CREDIT CARD FEE$13.60
PLUMBTOPOUT AND MECHRGH 10/01/2019 MLM$30.00
UTILITIES INSPECTION 12/26/2019 NMN$90.00
UTILITIES INSPECTION 01/03/2020 NMN$90.00
PLUMBTOPOUT AND MECHRGH 09/17/2019 WND$30.00
PLUMBTOPOUT AND MECHRGH 09/26/2019 WND$30.00
Total Fees:$5,888.10
______  METER PAYMENT
______  SET 1 PD METER
______  T-POLE
______  PLUMBING ROUGH-IN
______  SLAB RES
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  INSULATION RES
______  BRICKWALL TIES RES
______  DRYWALL RES
______  ELECT FINAL RES
______  ELECT FINAL RES
______  FLATWORK RES
______  GAS RELEASE
______  PLUMB MECH FINAL
______  UTILITIES INSPECTION
______  WATER REGISTER
______  UTILITIES INSPECTION
______  PLUMB MECH FINAL
______  UTILITIES INSPECTION
______  PLUMB MECH FINAL
______  PLUMB MECH FINAL
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)