Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 7/2/2019 PERMIT SUB-TYPE: SNEW PERMIT NO: B19-02787
JOB ADDRESS:
4252 KATMAI DR
FRISCO, TX
DESC:   4240 AC, 5184 SF, SFR / 2 STORY
OWNER:
DARLING HOMES OF TEXAS LLC

FRISCO TX 75034-5984

CONTRACTOR:
DARLING HOMES OF TEXAS LLC

FRISCO TX 75034
ISSUED DATE:
7/9/2019
APPLIED DATE:
6/5/2019
EXPIRED DATE:
12/27/2020
SITE APN:
D693687
STATUS:
COMPLETED
APPLICANT:
DARLING HOMES OF TEXAS LLC

FRISCO TX 75034
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
0
FEE SUMMARY
INSPECTION SUMMARY
1 INCH PD METER$435.00
WATER METER DEPOSIT$125.00
REPLACE DAMAGED/UNREADABLE REGISTER$500.00
RESIDENTIAL BUILDING PERMIT FEE$2,065.20
FENCE FEE$20.00
RESIDENTIAL FEE$155.52
RESIDENTIAL MECHANICAL FEE$152.50
RESIDENTIAL PLUMBING FEE$298.00
THOROUGHFARE IMPACT FEE$5,068.00
WATER IMPACT FEE$2,988.00
SEWER IMPACT FEE$2,185.00
CREDIT CARD FEE$2.40
CREDIT CARD FEE$12.40
FLATWORK RES 12/13/2019 JDR$30.00
UTILITIES INSPECTION 03/10/2020 NMN$90.00
SHEATHING 10/01/2019 RWT$30.00
FLATWORK RES 12/17/2019 RWT$30.00
FLATWORK RES 12/19/2019 RWT$30.00
GAS RELEASE 01/13/2020 SDC$30.00
Total Fees:$14,247.02
______  METER PAYMENT
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  T-POLE
______  SLAB RES
______  PTO AND MECH ROUGH
______  SHEATHING
______  SHEATHING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  LATH RES
______  INSULATION RES
______  INSULATION RES
______  DRYWALL RES
______  BRICKWALL TIES RES
______  FLATWORK RES
______  FLATWORK RES
______  FLATWORK RES
______  FLATWORK RES
______  FLATWORK RES
______  FLATWORK RES
______  ELECT FINAL RES
______  GAS RELEASE
______  GAS RELEASE
______  PLUMB MECH FINAL
______  UTILITIES INSPECTION
______  WATER REGISTER
______  UTILITIES INSPECTION
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)