|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 5/17/2019
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B19-02427
|
JOB ADDRESS: 13945 FERNANDO RD FRISCO, TX 75035 |
DESC:
4229 AC, 5258 SF, SFR / 2 STORY |
|
OWNER:
DUNHILL HOMES DFW LLC
DALLAS TX 75244-5087
|
CONTRACTOR:
TRENDMAKER HOMES DFW, LLC.
DALLAS TX 75244
|
ISSUED DATE: 5/31/2019
APPLIED DATE:5/10/2019
EXPIRED DATE:6/10/2020
SITE APN:C2757245
STATUS:COMPLETED
|
|
APPLICANT:
TRENDMAKER HOMES DFW, LLC.
DALLAS TX 75244
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 315525.69
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
1 INCH PD METER | $435.00 |
WATER METER DEPOSIT | $125.00 |
2NDS AND FRAMING 09/10/2019 CCM | $30.00 |
2NDS AND FRAMING 09/11/2019 CCM | $30.00 |
2NDS AND FRAMING 09/17/2019 CCM | $30.00 |
RESIDENTIAL BUILDING PERMIT FEE | $2,073.75 |
FENCE FEE | $20.00 |
RESIDENTIAL FEE | $157.74 |
RESIDENTIAL MECHANICAL FEE | $146.00 |
RESIDENTIAL PLUMBING FEE | $284.00 |
SEWER IMPACT FEE | $805.00 |
PLUMBTOPOUT AND MECHRGH 08/29/2019 DOT | $30.00 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $1.20 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $1.80 |
T-POLE 06/13/2019 JDW2 | $30.00 |
SLAB 07/01/2019 JDW2 | $30.00 |
SLAB 07/03/2019 JDW2 | $30.00 |
UTILITIES INSPECTION 11/27/2019 NMN | $90.00 |
INSULATION 10/09/2019 VCS | $30.00 |
DRYWALL RES 10/16/2019 VCS | $30.00 |
PLUMBING ROUGH-IN 06/18/2019 WND | $30.00 |
Total Fees: | $4,444.29 |
|
|
| ______ SET 1 PD METER |
______ T-POLE |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ SLAB RES |
______ SLAB RES |
______ FLATWORK |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ BRICK AND WALL TIES |
______ INSULATION RES |
______ INSULATION RES |
______ DRYWALL RES |
______ DRYWALL RES |
______ DRYWALL RES |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
______ METER PAYMENT |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|