|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 5/16/2019
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B19-02373
|
JOB ADDRESS: 3435 HARVEST GLEN DR FRISCO, TX |
DESC:
5073 AC, 5555 SF, SFR / 2 STORY |
|
OWNER:
GRAND HOMES 2014 LP
ADDISON TX 75001-6772
|
CONTRACTOR:
GRAND HOMES
ADDISON TX 75001
|
ISSUED DATE: 5/20/2019
APPLIED DATE:5/9/2019
EXPIRED DATE:6/24/2020
SITE APN:D677546
STATUS:COMPLETED
|
|
APPLICANT:
GRAND HOMES
ADDISON TX 75001
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 378496.53
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
1 INCH PD METER | $435.00 |
WATER METER DEPOSIT | $125.00 |
REPLACE DAMAGED/UNREADABLE REGISTER | $500.00 |
PLUMBING ROUGH-IN 05/28/2019 CI | $30.00 |
RESIDENTIAL BUILDING PERMIT FEE | $2,388.75 |
FENCE FEE | $20.00 |
RESIDENTIAL FEE | $166.65 |
RESIDENTIAL MECHANICAL FEE | $159.00 |
RESIDENTIAL PLUMBING FEE | $291.00 |
THOROUGHFARE IMPACT FEE | $0.00 |
WATER IMPACT FEE | $0.00 |
SEWER IMPACT FEE | $1,619.00 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $1.20 |
CREDIT CARD FEE | $1.20 |
CREDIT CARD FEE | $2.40 |
DRYWALL RES 10/15/2019 GLQ | $30.00 |
FLATWORK RES 12/06/2019 JDR | $30.00 |
FLATWORK RES 12/12/2019 JDR | $30.00 |
ELECT FINAL RES 12/17/2019 JDR | $30.00 |
PLUMBTOPOUT AND MECHRGH 09/24/2019 MLM | $30.00 |
PLUMBTOPOUT AND MECHRGH 09/30/2019 MLM | $30.00 |
PLUMBING ROUGH-IN 06/04/2019 SDC | $30.00 |
2NDS AND FRAMING 10/03/2019 TWC | $30.00 |
Total Fees: | $5,979.80 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ SET 1 PD METER |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ ELECTRICAL ROUGH IN |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ SHEATHING |
______ 2NDS AND FRAMING |
______ INSULATION RES |
______ INSULATION RES |
______ DRYWALL RES |
______ DRYWALL RES |
______ BRICKWALL TIES RES |
______ 2NDS AND FRAMING |
______ FLATWORK RES |
______ GAS RELEASE |
______ LATH RES |
______ FLATWORK RES |
______ FLATWORK RES |
______ ELECT FINAL RES |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ WATER REGISTER |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|