|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 4/23/2019
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B19-01726
|
JOB ADDRESS: 16687 TRUMPET VINE RD FRISCO, TX |
DESC:
3465 AC, 3981 SF, SFR / 2 STORY |
|
OWNER:
LANDON HOMES LP
PLANO TX 75093-3839
|
CONTRACTOR:
LANDON HOMES
PLANO TX 75093
|
ISSUED DATE: 4/30/2019
APPLIED DATE:4/11/2019
EXPIRED DATE:4/4/2020
SITE APN:D695840
STATUS:COMPLETED
|
|
APPLICANT:
LANDON HOMES
PLANO TX 75093
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 258523.65
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
1 INCH PD METER | $435.00 |
WATER METER DEPOSIT | $125.00 |
2NDS AND FRAMING 07/17/2019 CCM | $30.00 |
2NDS AND FRAMING 07/19/2019 CCM | $30.00 |
RESIDENTIAL BUILDING PERMIT FEE | $1,788.75 |
FENCE FEE | $20.00 |
RESIDENTIAL FEE | $119.43 |
RESIDENTIAL MECHANICAL FEE | $139.50 |
RESIDENTIAL PLUMBING FEE | $256.00 |
WATER IMPACT FEE | $635.00 |
SEWER IMPACT FEE | $1,619.00 |
PLUMBTOPOUT AND MECHRGH 07/15/2019 DOT | $30.00 |
CREDIT CARD FEE | $3.00 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $2.40 |
CREDIT CARD FEE | $0.60 |
UTILITIES INSPECTION 09/17/2019 NMN | $90.00 |
DRY WALL 08/07/2019 VCS | $30.00 |
DRY WALL 08/08/2019 VCS | $30.00 |
ELECTRICAL FINAL 09/05/2019 VCS | $30.00 |
ELECTRICAL FINAL 09/06/2019 VCS | $30.00 |
PLUMBMECHFINAL 09/26/2019 WND | $30.00 |
Total Fees: | $5,474.28 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ BRICK AND WALL TIES |
______ INSULATION |
______ DRY WALL |
______ DRY WALL |
______ DRY WALL |
______ GAS RELEASE |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ CO AND BUILDING FINAL |
______ CO AND BUILDING FINAL |
______ CO AND BUILDING FINAL |
______ CO AND BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|