|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 4/18/2019
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B19-01451
|
JOB ADDRESS: 12832 CABANA DR FRISCO, TX 75035 |
DESC:
3050 AC, 3792 SF, SFR / 2 STORY |
|
OWNER:
GRBK EDGEWOOD LLC
PLANO TX 75093-8722
|
CONTRACTOR:
NORMANDY HOMES EDGEWOOD, LLC
PLANO TX 75093
|
ISSUED DATE: 4/25/2019
APPLIED DATE:4/2/2019
EXPIRED DATE:3/28/2020
SITE APN:C2782635
STATUS:COMPLETED
|
|
APPLICANT:
NORMANDY HOMES EDGEWOOD, LLC
PLANO TX 75093
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 227560.5
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
SET 1 PD METER 04/26/2019 CAW2 | $80.00 |
REPLACE DAMAGED/UNREADABLE REGISTER | $500.00 |
MISCELLANEOUS FEE | $10.00 |
CREDIT CARD FEE | $1.60 |
CREDIT CARD FEE | $0.20 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $11.80 |
RESIDENTIAL BUILDING PERMIT FEE | $1,633.75 |
FENCE FEE | $20.00 |
RESIDENTIAL FEE | $110.34 |
RESIDENTIAL MECHANICAL FEE | $139.50 |
RESIDENTIAL PLUMBING FEE | $249.00 |
WATER IMPACT FEE | $1,847.00 |
SEWER IMPACT FEE | $1,619.00 |
UTILITIES INSPECTION 09/23/2019 NMN | $90.00 |
FLATWORK 08/19/2019 RWT | $30.00 |
1 INCH PD METER | $435.00 |
WATER METER DEPOSIT | $125.00 |
2NDS AND FRAMING 07/25/2019 WND | $30.00 |
Total Fees: | $6,933.39 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SHEATHING |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ BRICK AND WALL TIES |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ FLATWORK |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ PLUMBMECHFINAL |
______ GAS RELEASE |
______ UTILITIES INSPECTION |
______ WATER REGISTER |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ UTILITIES INSPECTION |
______ PLUMBMECHFINAL |
______ CO AND BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|