|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 4/10/2019
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B19-01332
|
JOB ADDRESS: 14614 BANDERA AVE FRISCO, TX |
DESC:
3598 AC, 4424 SF, SFR / 2 STORY |
|
OWNER:
BEAZER HOMES TEXAS LP
DALLAS TX 75234-9010
|
CONTRACTOR:
BEAZER HOMES
DALLAS TX 75234
|
ISSUED DATE: 4/16/2019
APPLIED DATE:3/26/2019
EXPIRED DATE:3/22/2020
SITE APN:C2726348
STATUS:COMPLETED
|
|
APPLICANT:
BEAZER HOMES
DALLAS TX 75234
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 268446.78
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
PLAN REVIEW FEE | $50.00 |
RESIDENTIAL BUILDING PERMIT FEE | $1,838.75 |
FENCE FEE | $20.00 |
RESIDENTIAL FEE | $132.72 |
RESIDENTIAL MECHANICAL FEE | $139.50 |
RESIDENTIAL PLUMBING FEE | $256.00 |
WATER IMPACT FEE | $806.00 |
SHEATHING 06/11/2019 JDW2 | $30.00 |
SHEATHING 06/14/2019 JDW2 | $30.00 |
2NDS AND FRAMING 07/08/2019 JDW2 | $30.00 |
2NDS AND FRAMING 07/10/2019 JDW2 | $30.00 |
2NDS AND FRAMING 07/11/2019 JDW2 | $30.00 |
1 INCH PD METER | $435.00 |
WATER METER DEPOSIT | $125.00 |
UTILITIES INSPECTION 09/12/2019 NMN | $90.00 |
SLAB 05/09/2019 REED | $30.00 |
PLUMBTOPOUT AND MECHRGH 06/11/2019 RR | $30.00 |
PLUMBTOPOUT AND MECHRGH 06/21/2019 RR | $30.00 |
PLUMBING ROUGH-IN 04/29/2019 SDC | $30.00 |
PLUMBING ROUGH-IN 04/30/2019 SDC | $30.00 |
PLUMBTOPOUT AND MECHRGH 06/19/2019 WND | $30.00 |
Total Fees: | $4,222.97 |
|
|
| ______ T-POLE |
______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ SLAB |
______ PLUMBTOPOUT AND MECHRGH |
______ SHEATHING |
______ SHEATHING |
______ SHEATHING |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ INSULATION |
______ BRICK AND WALL TIES |
______ DRY WALL |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ PLUMBMECHFINAL |
______ UTILITIES INSPECTION |
______ CO AND BUILDING FINAL |
______ UTILITIES INSPECTION |
______ CO AND BUILDING FINAL |
______ CO AND BUILDING FINAL |
______ CO AND BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|