|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 3/11/2019
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B19-00886
|
JOB ADDRESS: 13224 AZRA TRL FRISCO, TX |
DESC:
3764 AC , 4535 SF, SFR / 2 STORY |
|
OWNER:
BLUEBONNET BR DEVELOPMENT LLC
PLANO TX 75093-3839
|
CONTRACTOR:
LANDON HOMES
PLANO TX 75093
|
ISSUED DATE: 7/2/2019
APPLIED DATE:3/1/2019
EXPIRED DATE:5/6/2020
SITE APN:C2745450
STATUS:COMPLETED
|
|
APPLICANT:
LANDON HOMES
PLANO TX 75093
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
SET 1 PD METER 07/05/2019 EMS | $80.00 |
REPLACE DAMAGED/UNREADABLE REGISTER | $500.00 |
RESIDENTIAL PLUMBING FEE | $270.00 |
RESIDENTIAL MECHANICAL FEE | $132.75 |
RESIDENTIAL BUILDING PERMIT FEE | $1,865.85 |
RESIDENTIAL FEE | $136.05 |
WATER IMPACT FEE | $1,772.00 |
SEWER IMPACT FEE | $1,619.00 |
CREDIT CARD FEE | $1.60 |
CREDIT CARD FEE | $4.20 |
CREDIT CARD FEE | $10.00 |
CREDIT CARD FEE | $0.60 |
2NDS AND FRAMING 09/04/2019 JDR | $30.00 |
FLATWORK 09/25/2019 JDR | $30.00 |
UTILITIES INSPECTION 10/22/2019 NMN | $90.00 |
2NDS AND FRAMING 09/03/2019 RWT | $30.00 |
PLUMB MECH FINAL 10/30/2019 SMH | $30.00 |
1 INCH PD METER | $435.00 |
WATER METER DEPOSIT | $125.00 |
PLUMBTOPOUT AND MECHRGH 08/29/2019 WND | $30.00 |
Total Fees: | $7,192.05 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ SET 1 PD METER |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ LATH |
______ INSULATION RES |
______ 2NDS AND FRAMING |
______ DRY WALL |
______ FLATWORK |
______ FLATWORK |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ GAS RELEASE |
______ GAS RELEASE |
______ UTILITIES INSPECTION |
______ WATER REGISTER |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|