|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 3/13/2019
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B19-00643
|
JOB ADDRESS: 10251 CALVERY CT FRISCO, TX 75035 |
DESC:
6312 AC, 8207 SF, SFR / 2 STORY |
|
OWNER:
CHAUDHRY KAMRAN
FRISCO TX 75035-6662
|
CONTRACTOR:
SOIGNE POOL & PATIO OF NORTH TEXAS
412 Harmon Rd. Hurst TX 76053
|
ISSUED DATE: 3/13/2019
APPLIED DATE:2/13/2019
EXPIRED DATE:8/1/2022
SITE APN:ADD41741
STATUS:COMPLETED
|
|
APPLICANT:
SALCEDO CUSTOM HOMES LLC
DALLAS TX 75248
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 439676.73
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
FIRE DEPT INSPECTION FEES | $246.21 |
1 INCH PD METER | $435.00 |
WATER METER DEPOSIT | $125.00 |
SET 1 PD METER 04/03/2019 DAX | $80.00 |
PLAN REVIEW FEE | $200.00 |
RESIDENTIAL BUILDING PERMIT FEE | $2,693.75 |
RESIDENTIAL FEE | $246.21 |
FENCE FEE | $20.00 |
RESIDENTIAL PLUMBING FEE | $343.00 |
RESIDENTIAL MECHANICAL FEE | $192.00 |
PLUMBTOPOUT AND MECHRGH 09/06/2019 DOT | $30.00 |
PLUMBTOPOUT AND MECHRGH 09/11/2019 DOT | $30.00 |
CREDIT CARD FEE | $69.90 |
CREDIT CARD FEE | $1.60 |
CREDIT CARD FEE | $2.40 |
CREDIT CARD FEE | $1.80 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $4.00 |
CREDIT CARD FEE | $1.80 |
CREDIT CARD FEE | $7.80 |
2NDS AND FRAMING 09/17/2019 JDR | $30.00 |
2NDS AND FRAMING 09/24/2019 JDR | $30.00 |
2NDS AND FRAMING 10/03/2019 JDW2 | $30.00 |
2NDS AND FRAMING 10/07/2019 JDW2 | $30.00 |
INSULATION 10/10/2019 JDW2 | $30.00 |
UTILITIES INSPECTION 06/26/2020 NMN | $90.00 |
UTILITIES INSPECTION 02/03/2021 NMN | $90.00 |
REPLACE READABLE REGISTER | $300.00 |
1 INCH WATER TAP 8-12 IN PIPE | $1,320.00 |
PLUMBTOPOUT AND MECHRGH 08/30/2019 WND | $30.00 |
Total Fees: | $6,711.07 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ AUTOFIRE SPRK HYDRO |
______ AUTOFIRE SPRK VISUAL |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ ELECTRICAL ROUGH IN |
______ ELECTRICAL ROUGH IN |
______ 2NDS AND FRAMING |
______ ELECTRICAL ROUGH IN |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ INSULATION RES |
______ INSULATION RES |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ INSULATION RES |
______ INSULATION RES |
______ INSULATION RES |
______ DRYWALL RES |
______ BRICKWALL TIES RES |
______ LATH RES |
______ LATH RES |
______ FLATWORK RES |
______ FLATWORK RES |
______ UTILITIES INSPECTION |
______ ELECT FINAL RES |
______ ELECT FINAL RES |
______ MECHANICAL FINAL |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ MECHANICAL FINAL |
______ PLUMB MECH FINAL |
______ CO AND BUILD FINAL |
______ UTILITIES INSPECTION |
______ WATER REGISTER |
______ PLUMB MECH FINAL |
______ UTILITIES INSPECTION |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ CO AND BUILD FINAL |
______ SET 1 PD METER |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|