|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 2/15/2019
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B19-00346
|
JOB ADDRESS: 8186 EDGEFIELD CT FRISCO, TX 75035 |
DESC:
4555 AC , 5429 SF, SFR / 2 STORY |
|
OWNER:
GRBK EDGEWOOD LLC
PLANO TX 75093-8722
|
CONTRACTOR:
SOUTHGATE HOMES - EDGEWOOD, LLC
2805 Dallas Parkway, Suite 120 Plano TX 75093
|
ISSUED DATE: 2/15/2019
APPLIED DATE:1/28/2019
EXPIRED DATE:6/10/2020
SITE APN:C2782830
STATUS:COMPLETED
|
|
APPLICANT:
SOUTHGATE HOMES - EDGEWOOD, LLC
2805 Dallas Parkway, Suite 120 Plano TX 75093
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 339848.55
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
SHEATHING 05/14/2019 CCM | $30.00 |
MISCELLANEOUS FEE | $10.00 |
CREDIT CARD FEE | $125.43 |
CREDIT CARD FEE | $0.20 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $1.80 |
2NDS AND FRAMING 06/14/2019 GLQ | $30.00 |
ELECT FINAL RES 10/21/2019 JDR | $30.00 |
RESIDENTIAL BUILDING PERMIT FEE | $2,193.75 |
RESIDENTIAL FEE | $162.87 |
FENCE FEE | $20.00 |
RESIDENTIAL PLUMBING FEE | $270.00 |
RESIDENTIAL MECHANICAL FEE | $159.00 |
WATER IMPACT FEE | $1,847.00 |
SEWER IMPACT FEE | $1,619.00 |
1 INCH PD METER | $410.00 |
WATER METER DEPOSIT | $125.00 |
UTILITIES INSPECTION 11/08/2019 NMN | $90.00 |
Total Fees: | $7,125.85 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ SHEATHING |
______ SHEATHING |
______ SHEATHING |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ INSULATION RES |
______ DRY WALL |
______ FLATWORK |
______ BRICK AND WALL TIES |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ ELECT FINAL RES |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|