|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 2/8/2019
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B19-00287
|
JOB ADDRESS: 8793 SHADOW BAY LN FRISCO, TX 75036 |
DESC:
1835 AC, 2475 SF, SFR / 1 STORY |
|
OWNER:
PULTE HOMES OF TEXAS LP
COPPELL TX 75019-4795
|
CONTRACTOR:
PULTE HOMES
IRVING TX 75063
|
ISSUED DATE: 2/19/2019
APPLIED DATE:1/23/2019
EXPIRED DATE:12/18/2019
SITE APN:D729214
STATUS:COMPLETED
|
|
APPLICANT:
PULTE HOMES
IRVING TX 75063
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 136909.35
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
RESIDENTIAL BUILDING PERMIT FEE | $1,178.75 |
RESIDENTIAL FEE | $74.25 |
FENCE FEE | $20.00 |
RESIDENTIAL PLUMBING FEE | $191.00 |
RESIDENTIAL MECHANICAL FEE | $106.50 |
WATER IMPACT FEE | $1,207.00 |
REPLACE READABLE REGISTER | $290.00 |
CREDIT CARD FEE | $3.00 |
CREDIT CARD FEE | $5.80 |
SLAB 03/18/2019 ELS | $30.00 |
1 INCH PD METER | $410.00 |
WATER METER DEPOSIT | $125.00 |
UTILITIES INSPECTION 06/17/2019 NMN | $90.00 |
PLUMBING ROUGH-IN 03/06/2019 RR | $30.00 |
Total Fees: | $3,761.30 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ T-POLE |
______ SLAB |
______ SLAB |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS AND FRAMING |
______ INSULATION |
______ DRY WALL |
______ BRICK AND WALL TIES |
______ FLATWORK |
______ FLATWORK |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ GAS RELEASE |
______ UTILITIES INSPECTION |
______ WATER REGISTER |
______ PLUMBMECHFINAL |
______ UTILITIES INSPECTION |
______ DRY WALL |
______ CO AND BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|