|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 1/11/2019
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B19-00028
|
JOB ADDRESS: 12955 LOST CREEK DR FRISCO, TX 75033 |
DESC:
3973 AC, 4901 SF, SFR / 2 STORY |
|
OWNER:
KARETI, SUMANKUMAR & BHARATHI
FRISCO TX 75033-2937
|
CONTRACTOR:
LENNAR HOMES
14638 PENSHAM DR FRISCO TX 75034
|
ISSUED DATE: 1/30/2019
APPLIED DATE:1/4/2019
EXPIRED DATE:4/21/2020
SITE APN:D671913
STATUS:COMPLETED
|
|
APPLICANT:
LENNAR HOMES
14638 PENSHAM DR FRISCO TX 75034
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 296425.53
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
PLUMBTOPOUT AND MECHRGH 05/23/2019 ARG | $30.00 |
2NDS AND FRAMING 06/14/2019 CCM | $30.00 |
2NDS AND FRAMING 06/25/2019 CCM | $30.00 |
2NDS AND FRAMING 07/09/2019 CCM | $30.00 |
2NDS AND FRAMING 07/09/2019 CCM | $30.00 |
2NDS AND FRAMING 07/09/2019 CCM | $30.00 |
INSULATION 07/12/2019 CCM | $30.00 |
ELECTRICAL FINAL 08/26/2019 CCM | $30.00 |
PLUMBTOPOUT AND MECHRGH 06/06/2019 DOT | $30.00 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $2.40 |
CREDIT CARD FEE | $3.00 |
CREDIT CARD FEE | $1.80 |
CREDIT CARD FEE | $1.80 |
RESIDENTIAL BUILDING PERMIT FEE | $1,978.75 |
RESIDENTIAL FEE | $147.03 |
FENCE FEE | $20.00 |
RESIDENTIAL PLUMBING FEE | $298.00 |
RESIDENTIAL MECHANICAL FEE | $152.50 |
WATER IMPACT FEE | $1,772.00 |
SEWER IMPACT FEE | $1,619.00 |
1 INCH PD METER | $410.00 |
WATER METER DEPOSIT | $125.00 |
UTILITIES INSPECTION 09/26/2019 NMN | $90.00 |
PLUMBTOPOUT AND MECHRGH 05/08/2019 RR | $30.00 |
PLUMBTOPOUT AND MECHRGH 05/17/2019 RR | $30.00 |
SLAB 03/15/2019 TWC | $30.00 |
GAS RELEASE 08/26/2019 WND | $30.00 |
Total Fees: | $7,011.88 |
|
|
| ______ T-POLE |
______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ SLAB RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ INSULATION RES |
______ BRICK AND WALL TIES |
______ INSULATION RES |
______ DRY WALL |
______ FLATWORK |
______ GAS RELEASE |
______ ELECT FINAL RES |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|