|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 2/26/2019
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B18-06979
|
JOB ADDRESS: 1703 PORT ROYAL LN FRISCO, TX 75036 |
DESC:
2192 AC, 2873 SF, SFR / 1 STORY |
|
OWNER:
KAHN, EDWARD & WENDY
FRISCO TX 75036
|
CONTRACTOR:
PULTE HOMES
IRVING TX 75063
|
ISSUED DATE: 3/7/2019
APPLIED DATE:12/31/2018
EXPIRED DATE:2/24/2020
SITE APN:ADD205496
STATUS:COMPLETED
|
|
APPLICANT:
PULTE HOMES
IRVING TX 75063
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 163545.12
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
CO AND BUILDING FINAL 08/21/2019 ARG | $30.00 |
SET 1 PD METER 04/15/2019 CAW2 | $80.00 |
SET 1 PD METER 04/16/2019 ZM | $80.00 |
PLUMBMECHFINAL 08/06/2019 CI | $30.00 |
SET 1 PD METER 04/12/2019 HP | $80.00 |
CREDIT CARD FEE | $4.80 |
CREDIT CARD FEE | $2.40 |
CREDIT CARD FEE | $2.40 |
CREDIT CARD FEE | $0.60 |
2NDS AND FRAMING 06/11/2019 JWE2 | $30.00 |
2NDS AND FRAMING 06/12/2019 JWE2 | $30.00 |
INSULATION 06/21/2019 JWE2 | $30.00 |
RESIDENTIAL BUILDING PERMIT FEE | $1,313.75 |
RESIDENTIAL FEE | $86.19 |
FENCE FEE | $20.00 |
RESIDENTIAL PLUMBING FEE | $191.00 |
RESIDENTIAL MECHANICAL FEE | $106.50 |
WATER IMPACT FEE | $1,207.00 |
1 INCH PD METER | $435.00 |
WATER METER DEPOSIT | $125.00 |
UTILITIES INSPECTION 08/07/2019 NMN | $90.00 |
2NDS AND FRAMING 06/07/2019 VCS | $30.00 |
Total Fees: | $4,004.64 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ SET 1 PD METER |
______ SET 1 PD METER |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ BRICK AND WALL TIES |
______ 2NDS AND FRAMING |
______ BRICK AND WALL TIES |
______ INSULATION |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ FLATWORK |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ PLUMBMECHFINAL |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ PLUMBMECHFINAL |
______ CO AND BUILDING FINAL |
______ CO AND BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|