Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 1/9/2019 PERMIT SUB-TYPE: CIFO PERMIT NO: B18-06913
JOB ADDRESS:
6735 SALT CEDAR WAY
FRISCO, TX
DESC:   30000 SQ FT, CIFO / VENTURE X
OWNER:
GCRE/TX FRISCO MASTER LLC
ATTN JOSEPH GOVEIA
DANA POINT CA 92629-2853

CONTRACTOR:
K2 CONSTRUCTION

DALLAS TX 75206
ISSUED DATE:
1/15/2019
APPLIED DATE:
12/21/2018
EXPIRED DATE:
12/24/2019
SITE APN:
C2724802
STATUS:
COMPLETED
APPLICANT:
GARY DEVLEER

FRISCO TX 75036
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
1580000
FEE SUMMARY
INSPECTION SUMMARY
CREDIT CARD FEE$0.70
COMMERCIAL BUILDING PERMIT FEE$50.00
COMMERCIAL BUILDING PERMIT FEE$4,463.34
COMMERCIAL FEE$3,630.00
COMMERCIAL MECHANICAL FEE$4,530.00
COMMERCIAL PLUMBING FEE$8,130.00
FIRE DEPT INSPECTION FEES$900.00
FIRE DEPT INSPECTION FEES$150.00
FIRE DEPT INSPECTION FEES$50.00
INSULATION 02/15/2019 REED$35.00
ELECTRICAL FINAL 03/22/2019 REED$35.00
Total Fees:$21,974.04
______  ELECTRICAL ROUGH IN
______  PLUMBING ROUGH-IN
______  FRAME/ELEC WALL
______  PLUMBING ROUGH-IN
______  MECHANICAL ROUGH
______  INSULATION
______  INSULATION
______  INSULATION
______  AUTOFIRE SPRK HYDRO
______  MECHANICAL FINAL
______  CEILING
______  CEILING
______  ELECTRICAL FINAL
______  MECHANICAL FINAL
______  ELECTRICAL FINAL
______  FIRE FINAL
______  PLUMBING FINAL
______  BUILDING FINAL
______  COMM CO
______  FIRE FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)