|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 12/19/2018
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B18-06842
|
JOB ADDRESS: 13402 AGILE DR FRISCO, TX 75035 |
DESC:
2901 AC, 3389 SF, SFR / 2 STORY |
|
OWNER:
BLUEBONNET BR DEVELOPMENT LLC
PLANO TX 75093-3839
|
CONTRACTOR:
LANDON HOMES
PLANO TX 75093
|
ISSUED DATE: 1/8/2019
APPLIED DATE:12/14/2018
EXPIRED DATE:12/4/2019
SITE APN:C2763489
STATUS:COMPLETED
|
|
APPLICANT:
LANDON HOMES
PLANO TX 75093
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 216443.61
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
2NDS AND FRAMING 03/22/2019 ARG | $30.00 |
2NDS AND FRAMING 03/25/2019 ARG | $30.00 |
ELECTRICAL FINAL 05/06/2019 CCM | $30.00 |
RESIDENTIAL BUILDING PERMIT FEE | $1,578.75 |
RESIDENTIAL FEE | $101.67 |
FENCE FEE | $20.00 |
RESIDENTIAL PLUMBING FEE | $249.00 |
RESIDENTIAL MECHANICAL FEE | $146.00 |
WATER IMPACT FEE | $1,901.00 |
SEWER IMPACT FEE | $1,619.00 |
CREDIT CARD FEE | $1.80 |
CREDIT CARD FEE | $2.40 |
CREDIT CARD FEE | $1.80 |
INSULATION 04/02/2019 GLQ | $30.00 |
PLUMBTOPOUT AND MECHRGH 03/12/2019 MLM | $30.00 |
PLUMBTOPOUT AND MECHRGH 03/14/2019 MLM | $30.00 |
PLUMBTOPOUT AND MECHRGH 03/18/2019 MLM | $30.00 |
UTILITIES INSPECTION 05/21/2019 NMN | $90.00 |
1 INCH PD METER | $410.00 |
WATER METER DEPOSIT | $125.00 |
Total Fees: | $6,456.42 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ T-POLE |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ BRICK AND WALL TIES |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ DRY WALL |
______ FLATWORK |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ CO AND BUILDING FINAL |
______ CO AND BUILDING FINAL |
______ CO AND BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|