Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 1/10/2019 PERMIT SUB-TYPE: CIFO PERMIT NO: B18-06771
JOB ADDRESS:
6770 WINNING DR 900
FRISCO, TX 75034
DESC:   11215 SQ FT, CIFO / TROPHY PARK
OWNER:
BLUE STAR FRISCO RETAIL LP

FRISCO TX 75034-1962

CONTRACTOR:
GREEN TAG CONSTRUCTION
EXP COI
MELISSA TX 75454
ISSUED DATE:
1/11/2019
APPLIED DATE:
12/12/2018
EXPIRED DATE:
9/20/2020
SITE APN:
C2712517
STATUS:
COMPLETED
APPLICANT:
COEVAL STUDIO

DALLAS TX 75207
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
800000
FEE SUMMARY
INSPECTION SUMMARY
CREDIT CARD FEE$6.73
CREDIT CARD FEE$1.50
HEALTH FINAL 03/17/2020 BLJ$35.00
PLAN REVIEW FEE$50.00
COMMERCIAL BUILDING PERMIT FEE$2,795.25
COMMERCIAL ELECTRIC FEE$478.60
MISCELLANEOUS PLUMBING FEES$1,039.35
MISCELLANOUS MECHANICAL FEES$590.75
PLAN REVIEW FEE$50.00
COMMERCIAL BUILDING PERMIT FEE$50.00
FIRE DEPT INSPECTION FEES$336.45
FIRE DEPT INSPECTION FEES$75.00
FIRE DEPT INSPECTION FEES$150.00
FIRE DEPT INSPECTION FEES$75.00
FIRE DEPT INSPECTION FEES$50.00
CREDIT CARD FEE$1.00
FIRE DEPT INSPECTION FEES$50.00
CEILING 08/05/2019 REED$35.00
ELECTRICAL FINAL 10/10/2019 REED$35.00
BRICKWALL TIE COMM 12/05/2019 REED$35.00
Total Fees:$5,939.63
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  COMM SLAB
______  COMM SLAB
______  COMM PLUMB TOP OUT
______  COMM DRYWALL
______  INSULATION RES
______  FRAME AND ELEC WALL
______  COMM DRYWALL
______  MECHANICAL ROUGH
______  AUTOFIRE SPRK VISUAL
______  CEILING
______  CEILING
______  MECHANICAL ROUGH
______  ELEC WALL
______  ELECTRICAL RELEASE
______  ELECT FINAL RES
______  GAS PRESSURE
______  MECHANICAL ROUGH
______  GAS PRESSURE
______  MECHANICAL ROUGH
______  MECHANICAL ROUGH
______  ELECTRICAL ROUGH IN
______  FOOTINGS
______  MECHANICAL ROUGH
______  CEILING
______  PLUMBING ROUGH-IN
______  CEILING
______  MISC ELECTRIC
______  MECHANICAL ROUGH
______  GAS PRESSURE
______  GAS RELEASE
______  PLUMBING ROUGH-IN
______  AUTOFIRE SPRK HYDRO
______  PLUMBING FINAL
______  MECHANICAL FINAL
______  COURTESY HEALTH INSP
______  PLUMBING FINAL
______  ELECT FINAL RES
______  ELECT FINAL COMM
______  PLUMBING FINAL
______  HEALTH FINAL
______  COMM CO
______  FIRE FINAL
______  FIRE FINAL
______  COMM CO
______  COMM CO
______  ELECT ROUGH COMM
______  BRICKWALL TIE COMM
______  FRAME COMM
______  BRICKWALL TIE COMM
______  COMM CO
______  COMM CO
______  COMM CO
______  ELECT FINAL COMM
______  PLUMB MECH FINAL
______  HEALTH FINAL
______  COMM CO
______  HEALTH FINAL
______  FIRE FINAL
______  COMM CO
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)