|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 11/8/2018
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B18-06231
|
JOB ADDRESS: 8010 CABERNET ST FRISCO, TX 75035 |
DESC:
** MODEL** 4102 AC, 5160 SF, SFR / 2 STORY |
|
OWNER:
GRBK EDGEWOOD LLC
PLANO TX 75093-8722
|
CONTRACTOR:
SOUTHGATE HOMES - EDGEWOOD, LLC
2805 Dallas Parkway, Suite 120 Plano TX 75093
|
ISSUED DATE: 11/13/2018
APPLIED DATE:11/5/2018
EXPIRED DATE:12/16/2019
SITE APN:C2782556
STATUS:COMPLETED
|
|
APPLICANT:
SOUTHGATE HOMES - EDGEWOOD, LLC
2805 Dallas Parkway, Suite 120 Plano TX 75093
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 306050.22
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
ELECTRICAL FINAL 05/02/2019 CCM | $30.00 |
RESIDENTIAL BUILDING PERMIT FEE | $2,028.75 |
RESIDENTIAL FEE | $154.80 |
FENCE FEE | $20.00 |
RESIDENTIAL PLUMBING FEE | $287.00 |
RESIDENTIAL MECHANICAL FEE | $179.00 |
WATER IMPACT FEE | $1,847.00 |
SEWER IMPACT FEE | $1,619.00 |
MISCELLANEOUS FEE | $10.00 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $0.20 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $1.80 |
PLAN REVIEW FEE | $50.00 |
1 INCH PD METER | $410.00 |
WATER METER DEPOSIT | $125.00 |
UTILITIES INSPECTION 06/05/2019 NMN | $90.00 |
PLUMBING ROUGH-IN 11/29/2018 RR | $30.00 |
Total Fees: | $6,883.75 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SHEATHING |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ DRY WALL |
______ DRY WALL |
______ BRICK/WALL TIES |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ GAS RELEASE |
______ PLUMBMECHFINAL |
______ UTILITIES INSPECTION |
______ PLUMBMECHFINAL |
______ UTILITIES INSPECTION |
______ CO AND BUILDING FINAL |
______ CO AND BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|