|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 11/1/2018
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B18-06086
|
JOB ADDRESS: 1965 HARBOR POINTE DR FRISCO, TX 75036 |
DESC:
2209 AC, 2791 SF, SFR / 1 STORY |
|
OWNER:
PULTE HOMES OF TEXAS LP
COPPELL TX 75019-4795
|
CONTRACTOR:
PULTE HOMES
IRVING TX 75063
|
ISSUED DATE: 11/12/2018
APPLIED DATE:10/26/2018
EXPIRED DATE:11/5/2019
SITE APN:D713123
STATUS:COMPLETED
|
|
APPLICANT:
PULTE HOMES
IRVING TX 75063
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 171752.22
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
1 INCH PD METER | $410.00 |
WATER METER DEPOSIT | $125.00 |
SET 1 PD METER 12/11/2018 ZM | $80.00 |
MISCELLANEOUS FEE | $10.00 |
CREDIT CARD FEE | $1.60 |
CREDIT CARD FEE | $1.80 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $0.80 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $1.20 |
CREDIT CARD FEE | $1.80 |
T-POLE 12/17/2018 JDW2 | $30.00 |
SLAB 01/22/2019 JDW2 | $30.00 |
SLAB 01/23/2019 JDW2 | $30.00 |
UTILITIES INSPECTION 05/02/2019 NMN | $90.00 |
PLUMBTOPOUT/MECHRGH 02/20/2019 RR | $30.00 |
PLUMBING ROUGH-IN 01/08/2019 SDC | $30.00 |
RESIDENTIAL BUILDING PERMIT FEE | $1,353.75 |
RESIDENTIAL FEE | $83.25 |
FENCE FEE | $20.00 |
RESIDENTIAL PLUMBING FEE | $191.00 |
RESIDENTIAL MECHANICAL FEE | $106.50 |
WATER IMPACT FEE | $1,252.00 |
DRY WALL 03/07/2019 TWC | $30.00 |
FLATWORK 04/08/2019 VCS | $30.00 |
FLATWORK 04/09/2019 VCS | $30.00 |
Total Fees: | $3,969.90 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ SET 1 PD METER |
______ T-POLE |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ SLAB |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ INSULATION |
______ DRY WALL |
______ DRY WALL |
______ BRICK AND WALL TIES |
______ BRICK AND WALL TIES |
______ BRICK AND WALL TIES |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ FLATWORK |
______ FLATWORK |
______ FLATWORK |
______ DRY WALL |
______ PLUMBMECHFINAL |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ CO AND BUILDING FINAL |
______ CO AND BUILDING FINAL |
______ CO AND BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|