Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 9/26/2018 PERMIT SUB-TYPE: SALT PERMIT NO: B18-05566
JOB ADDRESS:
11334 BARCELONA LN
FRISCO, TX 75035
DESC:   SALT / FIRE DAMAGE REPAIR
OWNER:
JACOB THOMAS &
SWAPNA GEORGE CHERU THAZHOOR
FRISCO TX 75035-5043

CONTRACTOR:
JACOB THOMAS &
SWAPNA GEORGE CHERU THAZHOOR
FRISCO TX 75035-5043
ISSUED DATE:
9/26/2018
APPLIED DATE:
9/26/2018
EXPIRED DATE:
6/17/2020
SITE APN:
C2722310
STATUS:
COMPLETED
APPLICANT:
JACOB THOMAS &
SWAPNA GEORGE CHERU THAZHOOR
FRISCO TX 75035-5043
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
90000
FEE SUMMARY
INSPECTION SUMMARY
RESIDENTIAL MECHANICAL FEE$30.00
RESIDENTIAL BUILDING PERMIT FEE$923.75
RESIDENTIAL FEE$30.00
RESIDENTIAL PLUMBING FEE$30.00
ELECTRICAL ROUGH IN 12/28/2018 ELS$30.00
MISCFRAME 03/01/2019 MC$30.00
MISC PLUMB 03/01/2019 MC$30.00
INSULATION 04/01/2019 MC$30.00
DRY WALL 05/07/2019 MC$30.00
MISCFRAME 11/20/2018 VCS$30.00
Total Fees:$1,193.75
______  T-POLE
______  MISCFRAME
______  PLUMBING ROUGH-IN
______  ELECTRICAL ROUGH IN
______  MECHANICAL ROUGH
______  PLUMBING TOP OUT
______  MISCFRAME
______  ELECTRICAL ROUGH IN
______  PLUMBING TOP OUT
______  MISCFRAME
______  MISCFRAME
______  MISC PLUMB
______  MISC PLUMB
______  PTO AND MECH ROUGH
______  INSULATION RES
______  INSULATION RES
______  DRY WALL
______  ELECT FINAL RES
______  GAS RELEASE
______  MISC FINAL RES
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)