|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 9/12/2018
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B18-05260
|
JOB ADDRESS: 1914 MARINA POINT CT FRISCO, TX 75036 |
DESC:
** KEY LOT **2809 AC, 3699 SF, SFR / 1 STORY |
|
OWNER:
PULTE HOMES
IRVING TX 75063
|
CONTRACTOR:
PULTE HOMES
IRVING TX 75063
|
ISSUED DATE: 9/27/2018
APPLIED DATE:9/10/2018
EXPIRED DATE:7/29/2019
SITE APN:D729200
STATUS:COMPLETED
|
|
APPLICANT:
PULTE HOMES
IRVING TX 75063
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 209579.49
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
CREDIT CARD FEE | $1.80 |
DRY WALL 12/03/2018 JDW2 | $30.00 |
FLATWORK 12/12/2018 JDW2 | $30.00 |
ELECTRICAL FINAL 01/03/2019 JDW2 | $30.00 |
1 INCH PD METER | $410.00 |
WATER METER DEPOSIT | $125.00 |
WATER IMPACT FEE | $1,207.00 |
RESIDENTIAL MECHANICAL FEE | $133.00 |
RESIDENTIAL PLUMBING FEE | $212.00 |
FENCE FEE | $20.00 |
RESIDENTIAL FEE | $110.97 |
RESIDENTIAL BUILDING PERMIT FEE | $1,543.75 |
Total Fees: | $3,853.52 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ SLAB |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ BRICK/WALL TIES |
______ INSULATION |
______ DRY WALL |
______ DRY WALL |
______ FLATWORK |
______ FLATWORK |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ UTILITIES INSPECTION |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|