Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 9/5/2018 PERMIT SUB-TYPE: SALT PERMIT NO: B18-05133
JOB ADDRESS:
5653 CHAMBERLYNE DR
FRISCO, TX 75034
DESC:   1369 SQ FT, SALT / ADDING QUARTERS
OWNER:
BEDAPUDI PRAKASH & PRASANTHI R

FRISCO TX 75034-4881

CONTRACTOR:
VCH CONSTRUCTION LP

DALLAS TX 75252
ISSUED DATE:
9/10/2018
APPLIED DATE:
8/27/2018
EXPIRED DATE:
8/19/2020
SITE APN:
C2068900
STATUS:
COMPLETED
APPLICANT:
VCH CONSTRUCTION LP

DALLAS TX 75252
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
275000
FEE SUMMARY
INSPECTION SUMMARY
RESIDENTIAL MECHANICAL FEE$106.50
PLUMBING ROUGH-IN 11/07/2019 DOT$30.00
CREDIT CARD FEE$1.20
RESIDENTIAL BUILDING PERMIT FEE$1,868.75
MISCELLANEOUS PLUMBING FEES$200.00
RESIDENTIAL FEE$41.07
DRY WALL 07/25/2019 MS2$30.00
Total Fees:$2,277.52
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  MISC SLAB
______  PLUMBING ROUGH-IN
______  MISCFRAME
______  SHEATHING
______  MECHANICAL ROUGH
______  PLUMBING TOP OUT
______  ELECTRICAL ROUGH IN
______  MECHANICAL ROUGH
______  PLUMBING TOP OUT
______  PLUMBING TOP OUT
______  ELECTRICAL ROUGH IN
______  MISCFRAME
______  LATH
______  INSULATION RES
______  DRY WALL
______  DRY WALL
______  DRY WALL
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  ELECT FINAL RES
______  PLUMBING FINAL
______  MECHANICAL FINAL
______  MECHANICAL FINAL
______  PLUMBING FINAL
______  MISC FINAL RES
______  MISC FINAL RES
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)