Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 9/13/2018 PERMIT SUB-TYPE: CIFO PERMIT NO: B18-05040
JOB ADDRESS:
2552 STONEBROOK PKWY 202
FRISCO, TX 75034
DESC:   1202 SQ FT, CIFO / THE LOUNGE COFFEE AND TEA BAR LLC
OWNER:
SHOPS AT STONEBROOK LLC

DENTON TX 76207-3441

CONTRACTOR:
PARK CITIES CONTRACTORS LTD

WYLIE TX 75098
ISSUED DATE:
9/17/2018
APPLIED DATE:
8/27/2018
EXPIRED DATE:
8/24/2019
SITE APN:
D43486
STATUS:
COMPLETED
APPLICANT:
MICHAEL SALAZAR

FRISCO TX 75036
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
48780
FEE SUMMARY
INSPECTION SUMMARY
COMMERCIAL BUILDING PERMIT FEE$380.19
COMMERCIAL FEE$78.08
COMMERCIAL MECHANICAL FEE$90.10
COMMERCIAL PLUMBING FEE$138.18
FIRE DEPT INSPECTION FEES$50.00
FIRE DEPT INSPECTION FEES$50.00
Total Fees:$786.55
______  ELEC WALL
______  MECHANICAL ROUGH
______  PLUMBING ROUGH-IN
______  GREASE TRAP
______  GREASE TRAP
______  FLATWORK
______  FLATWORK
______  FRAME/ELEC WALL
______  INSULATION
______  COMM PLUMB TOP OUT
______  COMM FRAME
______  COMM PLUMB TOP OUT
______  COMM DRYWALL
______  COMM DRYWALL
______  ELECTRICAL RELEASE
______  AUTOFIRE SPRK VISUAL
______  ELECTRICAL RELEASE
______  CEILING
______  CEILING
______  CEILING
______  CEILING
______  GAS RELEASE
______  GAS PRESSURE
______  AUTOFIRE ALARM
______  FIRE FINAL
______  PLUMBING FINAL
______  ELECTRICAL FINAL
______  MECHANICAL FINAL
______  FIRE FINAL
______  COURTESY HEALTH INSP
______  HEALTH FINAL
______  COMM CO
______  FIRE FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)