Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 8/28/2018 PERMIT SUB-TYPE: SNEW PERMIT NO: B18-05007
JOB ADDRESS:
11730 LA GRANGE DR
FRISCO, TX 75035
DESC:   3357 AC, 3969 SF, SFR / 2 STORY
OWNER:
SUMEER HOMES

IRVING TX 75062

CONTRACTOR:
SUMEER HOMES

IRVING TX 75062
ISSUED DATE:
9/4/2018
APPLIED DATE:
8/23/2018
EXPIRED DATE:
6/10/2020
SITE APN:
C2519916
STATUS:
COMPLETED
APPLICANT:
SUMEER HOMES

IRVING TX 75062
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
250465.77
FEE SUMMARY
INSPECTION SUMMARY
SET 1 PD METER 02/14/2019 DAX$80.00
REPLACE READABLE REGISTER$290.00
ELECTRICAL FINAL 09/06/2019 CCM$30.00
GAS RELEASE 09/06/2019 DOT$30.00
GAS RELEASE 09/18/2019 DOT$30.00
GAS RELEASE 09/20/2019 DOT$30.00
GAS RELEASE 09/30/2019 DOT$30.00
CREDIT CARD FEE$1.60
CREDIT CARD FEE$3.00
CREDIT CARD FEE$0.60
CREDIT CARD FEE$2.40
CREDIT CARD FEE$10.00
CREDIT CARD FEE$3.60
CREDIT CARD FEE$1.80
RESIDENTIAL BUILDING PERMIT FEE$1,748.75
RESIDENTIAL FEE$119.07
FENCE FEE$20.00
RESIDENTIAL PLUMBING FEE$263.00
RESIDENTIAL MECHANICAL FEE$146.00
2NDS AND FRAMING 06/11/2019 JDW2$30.00
2NDS AND FRAMING 06/19/2019 JDW2$30.00
DRY WALL 07/09/2019 JDW2$30.00
1 INCH PD METER$410.00
WATER METER DEPOSIT$125.00
UTILITIES INSPECTION 10/14/2019 NMN$90.00
UTILITIES INSPECTION 10/22/2019 NMN$90.00
UTILITIES INSPECTION 10/30/2019 NMN$90.00
UTILITIES INSPECTION 11/07/2019 NMN$90.00
UTILITIES INSPECTION 11/14/2019 NMN$90.00
PLUMBTOPOUT AND MECHRGH 05/23/2019 RR$30.00
PLUMBTOPOUT AND MECHRGH 06/04/2019 RR$30.00
PLUMBTOPOUT AND MECHRGH 05/22/2019 SDC$30.00
Total Fees:$4,004.82
______  METER PAYMENT
______  T-POLE
______  SET 1 PD METER
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SLAB RES
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  BRICK AND WALL TIES
______  INSULATION RES
______  DRY WALL
______  DRY WALL
______  FLATWORK
______  ELECT FINAL RES
______  GAS RELEASE
______  ELECT FINAL RES
______  GAS RELEASE
______  GAS RELEASE
______  GAS RELEASE
______  GAS RELEASE
______  UTILITIES INSPECTION
______  WATER REGISTER
______  UTILITIES INSPECTION
______  GAS RELEASE
______  UTILITIES INSPECTION
______  UTILITIES INSPECTION
______  UTILITIES INSPECTION
______  UTILITIES INSPECTION
______  PLUMB MECH FINAL
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
______  CO
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)