Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 8/9/2018 PERMIT SUB-TYPE: CIFO PERMIT NO: B18-04558
JOB ADDRESS:
3803 PARKWOOD BLVD 400
FRISCO, TX 75034
DESC:   4924 SQ FT, CIFO / TRUE HEALTH
OWNER:
SDI-PARKWOOD LLC
C/O GRANT SODERBERG
OKLAHOMA CITY OK 73116-9039

CONTRACTOR:
ELLECO CONSTRUCTION GROUP

DALLAS TX 75222
ISSUED DATE:
8/15/2018
APPLIED DATE:
7/27/2018
EXPIRED DATE:
3/19/2019
SITE APN:
C2608236
STATUS:
COMPLETED
APPLICANT:
ELLECO CONSTRUCTION GROUP

DALLAS TX 75222
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
155658
FEE SUMMARY
INSPECTION SUMMARY
CREDIT CARD FEE$2.95
FIRE DEPT INSPECTION FEES$147.72
CREDIT CARD FEE$36.31
CREDIT CARD FEE$2.70
COMMERCIAL BUILDING PERMIT FEE$764.25
COMMERCIAL MECHANICAL FEE$276.20
COMMERCIAL PLUMBING FEE$473.16
COMMERCIAL FEE$226.96
COMMERCIAL FEE$50.00
FIRE DEPT INSPECTION FEES$50.00
CEILING 08/23/2018 REED$35.00
FIRE FINAL 09/11/2018 RJB$50.00
FIRE DEPT INSPECTION FEES$75.00
Total Fees:$2,190.25
______  ELECTRICAL ROUGH IN
______  MECHANICAL ROUGH
______  PLUMBING ROUGH-IN
______  FRAME/ELEC WALL
______  CEILING
______  PLUMBING ROUGH-IN
______  ELECTRICAL ROUGH IN
______  FRAME/ELEC WALL
______  FRAME/ELEC WALL
______  AUTOFIRE SPRK VISUAL
______  CEILING
______  COMM PLUMB TOP OUT
______  COMM DRYWALL
______  CEILING
______  ELECTRICAL FINAL
______  MECHANICAL FINAL
______  ELECTRICAL FINAL
______  FIRE FINAL
______  PLUMBING FINAL
______  COMM CO
______  PLUMBING FINAL
______  COMM CO
______  PLUMBING FINAL
______  COMM CO
______  FIRE FINAL
______  COMM CO
______  FIRE FINAL
______  ACCESS CONTROL ACCEP
______  ACCESS CONTROL ACCEP
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)