Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 8/6/2018 PERMIT SUB-TYPE: SNEW PERMIT NO: B18-04551
JOB ADDRESS:
2353 FLAT CREEK RD
FRISCO, TX 75036
DESC:   4411 AC, 5588 SF, SFR / 2 STORY
OWNER:
CALATLANTIC HOMES OF TEXAS INC

FRISCO TX 75034-6015

CONTRACTOR:
LENNAR HOMES
14638 PENSHAM DR
FRISCO TX 75034
ISSUED DATE:
8/20/2018
APPLIED DATE:
7/23/2018
EXPIRED DATE:
11/17/2019
SITE APN:
D701877
STATUS:
EXPIRED
APPLICANT:
CALATLANTIC HOMES

IRVING TX 75039
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
329104.71
FEE SUMMARY
INSPECTION SUMMARY
1 INCH PD METER$410.00
WATER METER DEPOSIT$125.00
GAS RELEASE 04/15/2019 DOT$30.00
GAS RELEASE 04/15/2019 DOT$30.00
CREDIT CARD FEE$2.40
CREDIT CARD FEE$0.60
SLAB 11/05/2018 JDW2$30.00
2NDS/FRAMING 01/21/2019 JDW2$30.00
2NDS/FRAMING 01/29/2019 JDW2$30.00
UTILITIES INSPECTION 05/09/2019 NMN$90.00
UTILITIES INSPECTION 05/15/2019 NMN$90.00
1 INCH CURBSTOP REPAIR / REPLACE$350.00
UTILITIES INSPECTION 05/20/2019 NMN$90.00
PLUMBTOPOUT/MECHRGH 01/04/2019 SDC$30.00
PLUMBTOPOUT/MECHRGH 01/10/2019 SDC$30.00
REPLACEMENT CARD FEE$10.00
PLUMBTOPOUT/MECHRGH 01/03/2019 WND$30.00
CREDIT CARD FEE$0.80
WATER IMPACT FEE$1,772.00
SEWER IMPACT FEE$0.00
THOROUGHFARE IMPACT FEE$3,816.00
RESIDENTIAL FEE$167.64
FENCE FEE$20.00
RESIDENTIAL BUILDING PERMIT FEE$2,143.75
RESIDENTIAL MECHANICAL FEE$146.00
RESIDENTIAL PLUMBING FEE$291.00
Total Fees:$9,765.19
______  T-POLE
______  METER PAYMENT
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SLAB
______  SLAB
______  SLAB
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  2NDS/FRAMING
______  2NDS/FRAMING
______  2NDS/FRAMING
______  2NDS/FRAMING
______  2NDS/FRAMING
______  2NDS/FRAMING
______  INSULATION
______  BRICK/WALL TIES
______  DRY WALL
______  DRY WALL
______  BRICK AND WALL TIES
______  ELECTRICAL FINAL
______  FLATWORK
______  GAS RELEASE
______  GAS RELEASE
______  UTILITIES INSPECTION
______  UTILITIES INSPECTION
______  PLUMBMECHFINAL
______  UTILITIES INSPECTION
______  CO AND BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)