Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 7/20/2018 PERMIT SUB-TYPE: SNEW PERMIT NO: B18-04067
JOB ADDRESS:
1702 CORALBEAD RD
FRISCO, TX 75033
DESC:   4248 AC, 5402 SF, SFR / 2 STORY
OWNER:
HIGHLAND HOMES DALLAS LLC
FORESTAR (USA) REAL ESTATE GROUP, INC
AUSTIN TX 78750-1416

CONTRACTOR:
HIGHLAND HOMES
SUITE 300
PLANO TX 75024
ISSUED DATE:
7/31/2018
APPLIED DATE:
7/2/2018
EXPIRED DATE:
9/23/2019
SITE APN:
ADD154214
STATUS:
COMPLETED
APPLICANT:
HIGHLAND HOMES
SUITE 300
PLANO TX 75024
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
316943.28
FEE SUMMARY
INSPECTION SUMMARY
2NDS/FRAMING 10/16/2018 ARG$30.00
2NDS/FRAMING 10/22/2018 ARG$30.00
REPLACE DAMAGED AND UNREADABLE REGISTER$500.00
$0.00
UTILITIES INSPECTION 03/12/2019 NMN$45.00
$0.00
$0.00
$0.00
PLUMBMECHFINAL 02/06/2019 CI$30.00
PLUMBMECHFINAL 02/20/2019 CI$30.00
PLUMBING ROUGH-IN 08/16/2018 CK$30.00
PLUMBTOPOUT/MECHRGH 10/03/2018 DOT$30.00
RESIDENTIAL BUILDING PERMIT FEE$2,078.75
FENCE FEE$20.00
RESIDENTIAL FEE$162.06
MISCELLANEOUS PLUMBING FEES$291.00
MISCELLANOUS MECHANICAL FEES$159.00
MISCELLANEOUS BUILDING PERMIT FEES$10.00
1 INCH PD METER$410.00
WATER METER DEPOSIT$125.00
UTILITIES INSPECTION 03/12/2019 NMN$35.00
UTILITIES INSPECTION 03/20/2019 NMN$80.00
SEWER IMPACT FEE$1,619.00
WATER IMPACT FEE$426.00
SLAB 08/28/2018 VCS$30.00
FLATWORK 08/28/2018 VCS$30.00
FLATWORK 08/29/2018 VCS$30.00
Total Fees:$6,230.81
______  METER PAYMENT
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  T-POLE
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SLAB
______  FLATWORK
______  SLAB
______  FLATWORK
______  FLATWORK
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  2NDS/FRAMING
______  2NDS/FRAMING
______  2NDS/FRAMING
______  2NDS/FRAMING
______  2NDS/FRAMING
______  2NDS/FRAMING
______  2NDS/FRAMING
______  INSULATION
______  DRY WALL
______  BRICK/WALL TIES
______  ELECTRICAL FINAL
______  GAS RELEASE
______  PLUMBMECHFINAL
______  WATER REGISTER
______  PLUMBMECHFINAL
______  PLUMBMECHFINAL
______  UTILITIES INSPECTION
______  UTILITIES INSPECTION
______  UTILITIES INSPECTION
______  CO AND BUILDING FINAL
______  CO AND BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)