|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 7/20/2018
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B18-04067
|
JOB ADDRESS: 1702 CORALBEAD RD FRISCO, TX 75033 |
DESC:
4248 AC, 5402 SF, SFR / 2 STORY |
|
OWNER:
HIGHLAND HOMES DALLAS LLC
FORESTAR (USA) REAL ESTATE GROUP, INC AUSTIN TX 78750-1416
|
CONTRACTOR:
HIGHLAND HOMES
SUITE 300 PLANO TX 75024
|
ISSUED DATE: 7/31/2018
APPLIED DATE:7/2/2018
EXPIRED DATE:9/23/2019
SITE APN:ADD154214
STATUS:COMPLETED
|
|
APPLICANT:
HIGHLAND HOMES
SUITE 300 PLANO TX 75024
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 316943.28
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
2NDS/FRAMING 10/16/2018 ARG | $30.00 |
2NDS/FRAMING 10/22/2018 ARG | $30.00 |
REPLACE DAMAGED AND UNREADABLE REGISTER | $500.00 |
| $0.00 |
UTILITIES INSPECTION 03/12/2019 NMN | $45.00 |
| $0.00 |
| $0.00 |
| $0.00 |
PLUMBMECHFINAL 02/06/2019 CI | $30.00 |
PLUMBMECHFINAL 02/20/2019 CI | $30.00 |
PLUMBING ROUGH-IN 08/16/2018 CK | $30.00 |
PLUMBTOPOUT/MECHRGH 10/03/2018 DOT | $30.00 |
RESIDENTIAL BUILDING PERMIT FEE | $2,078.75 |
FENCE FEE | $20.00 |
RESIDENTIAL FEE | $162.06 |
MISCELLANEOUS PLUMBING FEES | $291.00 |
MISCELLANOUS MECHANICAL FEES | $159.00 |
MISCELLANEOUS BUILDING PERMIT FEES | $10.00 |
1 INCH PD METER | $410.00 |
WATER METER DEPOSIT | $125.00 |
UTILITIES INSPECTION 03/12/2019 NMN | $35.00 |
UTILITIES INSPECTION 03/20/2019 NMN | $80.00 |
SEWER IMPACT FEE | $1,619.00 |
WATER IMPACT FEE | $426.00 |
SLAB 08/28/2018 VCS | $30.00 |
FLATWORK 08/28/2018 VCS | $30.00 |
FLATWORK 08/29/2018 VCS | $30.00 |
Total Fees: | $6,230.81 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ FLATWORK |
______ SLAB |
______ FLATWORK |
______ FLATWORK |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ DRY WALL |
______ BRICK/WALL TIES |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ PLUMBMECHFINAL |
______ WATER REGISTER |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ CO AND BUILDING FINAL |
______ CO AND BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|