|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 7/19/2018
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B18-04022
|
JOB ADDRESS: 11102 ORTEGA ST FRISCO, TX 75035 |
DESC:
3725 AC, 4511 SF, SFR / 2 STORY |
|
OWNER:
PULTE HOMES OF TEXAS LP
COPPELL TX 75019-4796
|
CONTRACTOR:
PULTE HOMES
IRVING TX 75063
|
ISSUED DATE: 7/24/2018
APPLIED DATE:6/28/2018
EXPIRED DATE:3/24/2020
SITE APN:C2764145
STATUS:COMPLETED
|
|
APPLICANT:
PULTE HOMES
IRVING TX 75063
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 203312.25
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
PLUMBTOPOUT/MECHRGH 01/17/2019 CK | $30.00 |
CREDIT CARD FEE | $1.20 |
CREDIT CARD FEE | $6.00 |
INSULATION 02/19/2019 GLQ | $30.00 |
1 INCH PD METER | $410.00 |
WATER METER DEPOSIT | $125.00 |
PLUMBTOPOUT/MECHRGH 01/15/2019 MLM | $30.00 |
PLUMBTOPOUT/MECHRGH 01/23/2019 MLM | $30.00 |
PLUMBTOPOUT/MECHRGH 01/28/2019 MLM | $30.00 |
UTILITIES INSPECTION 06/12/2019 NMN | $90.00 |
UTILITIES INSPECTION 06/14/2019 NMN | $90.00 |
UTILITIES INSPECTION 06/24/2019 NMN | $90.00 |
PLUMBMECHFINAL 06/11/2019 RR | $30.00 |
WATER IMPACT FEE | $805.00 |
THOROUGHFARE IMPACT FEE | $0.00 |
SEWER IMPACT FEE | $0.00 |
CREDIT CARD FEE | $1.80 |
ELECTRICAL FINAL 03/29/2019 GLQ | $30.00 |
2NDS/FRAMING 02/06/2019 GLQ | $30.00 |
CREDIT CARD FEE | $0.20 |
CREDIT CARD FEE | $1.20 |
FENCE FEE | $20.00 |
RESIDENTIAL BUILDING PERMIT FEE | $1,513.75 |
MISCELLANEOUS FEE | $10.00 |
MISCELLANOUS MECHANICAL FEES | $139.50 |
MISCELLANEOUS PLUMBING FEES | $258.00 |
RESIDENTIAL FEE | $135.33 |
Total Fees: | $3,936.98 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ T-POLE |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ BRICK and WALL TIES |
______ GAS RELEASE |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ PLUMBMECHFINAL |
______ UTILITIES INSPECTION |
______ PLUMBMECHFINAL |
______ CO AND BUILDING FINAL |
______ CO AND BUILDING FINAL |
______ UTILITIES INSPECTION |
______ CO AND BUILDING FINAL |
______ CO AND BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|