Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 7/19/2018 PERMIT SUB-TYPE: SNEW PERMIT NO: B18-04022
JOB ADDRESS:
11102 ORTEGA ST
FRISCO, TX 75035
DESC:   3725 AC, 4511 SF, SFR / 2 STORY
OWNER:
PULTE HOMES OF TEXAS LP

COPPELL TX 75019-4796

CONTRACTOR:
PULTE HOMES

IRVING TX 75063
ISSUED DATE:
7/24/2018
APPLIED DATE:
6/28/2018
EXPIRED DATE:
3/24/2020
SITE APN:
C2764145
STATUS:
COMPLETED
APPLICANT:
PULTE HOMES

IRVING TX 75063
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
203312.25
FEE SUMMARY
INSPECTION SUMMARY
PLUMBTOPOUT/MECHRGH 01/17/2019 CK$30.00
CREDIT CARD FEE$1.20
CREDIT CARD FEE$6.00
INSULATION 02/19/2019 GLQ$30.00
1 INCH PD METER$410.00
WATER METER DEPOSIT$125.00
PLUMBTOPOUT/MECHRGH 01/15/2019 MLM$30.00
PLUMBTOPOUT/MECHRGH 01/23/2019 MLM$30.00
PLUMBTOPOUT/MECHRGH 01/28/2019 MLM$30.00
UTILITIES INSPECTION 06/12/2019 NMN$90.00
UTILITIES INSPECTION 06/14/2019 NMN$90.00
UTILITIES INSPECTION 06/24/2019 NMN$90.00
PLUMBMECHFINAL 06/11/2019 RR$30.00
WATER IMPACT FEE$805.00
THOROUGHFARE IMPACT FEE$0.00
SEWER IMPACT FEE$0.00
CREDIT CARD FEE$1.80
ELECTRICAL FINAL 03/29/2019 GLQ$30.00
2NDS/FRAMING 02/06/2019 GLQ$30.00
CREDIT CARD FEE$0.20
CREDIT CARD FEE$1.20
FENCE FEE$20.00
RESIDENTIAL BUILDING PERMIT FEE$1,513.75
MISCELLANEOUS FEE$10.00
MISCELLANOUS MECHANICAL FEES$139.50
MISCELLANEOUS PLUMBING FEES$258.00
RESIDENTIAL FEE$135.33
Total Fees:$3,936.98
______  METER PAYMENT
______  T-POLE
______  T-POLE
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  SLAB
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  2NDS/FRAMING
______  2NDS/FRAMING
______  INSULATION
______  INSULATION
______  DRY WALL
______  BRICK and WALL TIES
______  GAS RELEASE
______  FLATWORK
______  ELECTRICAL FINAL
______  ELECTRICAL FINAL
______  PLUMBMECHFINAL
______  PLUMBMECHFINAL
______  UTILITIES INSPECTION
______  UTILITIES INSPECTION
______  PLUMBMECHFINAL
______  UTILITIES INSPECTION
______  PLUMBMECHFINAL
______  CO AND BUILDING FINAL
______  CO AND BUILDING FINAL
______  UTILITIES INSPECTION
______  CO AND BUILDING FINAL
______  CO AND BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)