Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 7/6/2018 PERMIT SUB-TYPE: SNEW PERMIT NO: B18-03754
JOB ADDRESS:
2036 MARSH POINT DR
FRISCO, TX
DESC:   1411 AC, 2100 SF, SFR / 1 STORY
OWNER:
PULTE HOMES OF TEXAS LP

IRVING TX 75063-2439

CONTRACTOR:
PULTE HOMES

IRVING TX 75063
ISSUED DATE:
7/18/2018
APPLIED DATE:
6/15/2018
EXPIRED DATE:
5/15/2019
SITE APN:
D714153
STATUS:
COMPLETED
APPLICANT:
PULTE HOMES

IRVING TX 75063
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
105423.93
FEE SUMMARY
INSPECTION SUMMARY
WATER IMPACT FEE$1,252.00
THOROUGHFARE IMPACT FEE$0.00
SEWER IMPACT FEE$0.00
CREDIT CARD FEE$0.60
RESIDENTIAL BUILDING PERMIT FEE$1,023.75
FENCE FEE$20.00
RESIDENTIAL FEE$63.00
MISCELLANEOUS PLUMBING FEES$191.00
MISCELLANOUS MECHANICAL FEES$100.00
1 INCH PD METER$410.00
WATER METER DEPOSIT$125.00
SLAB 08/01/2018 TWC$30.00
Total Fees:$3,215.35
______  METER PAYMENT
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  SLAB
______  SLAB
______  T-POLE
______  SLAB
______  PLUMBTOPOUT AND MECHRGH
______  2NDS/FRAMING
______  INSULATION
______  DRY WALL
______  BRICK/WALL TIES
______  FLATWORK
______  ELECTRICAL FINAL
______  ELECTRICAL FINAL
______  GAS RELEASE
______  FLATWORK
______  PLUMBMECHFINAL
______  UTILITIES INSPECTION
______  CO/BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)