|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 7/6/2018
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B18-03721
|
JOB ADDRESS: 11121 MEDALLION LN FRISCO, TX 75035 |
DESC:
4061 AC, 4948 SF, SFR / 2 STORY |
|
OWNER:
MASTER DEVELOPERS-SWB LLC
PLANO TX 75093-4381
|
CONTRACTOR:
SHADDOCK HOMES LTD
PLANO TX 75093
|
ISSUED DATE: 7/18/2018
APPLIED DATE:6/15/2018
EXPIRED DATE:5/8/2019
SITE APN:C2736774
STATUS:COMPLETED
|
|
APPLICANT:
SHADDOCK HOMES LTD
PLANO TX 75093
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 302991.21
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
PLUMBTOPOUT/MECHRGH 09/06/2018 ARG | $30.00 |
PLUMBTOPOUT/MECHRGH 09/10/2018 ARG | $30.00 |
PLUMBTOPOUT/MECHRGH 09/12/2018 ARG | $30.00 |
FLATWORK 10/08/2018 CCM | $30.00 |
GAS RELEASE 10/22/2018 CK | $30.00 |
WATER IMPACT FEE | $1,797.00 |
THOROUGHFARE IMPACT FEE | $3,280.00 |
SEWER IMPACT FEE | $1,619.00 |
RESIDENTIAL BUILDING PERMIT FEE | $2,008.75 |
FENCE FEE | $20.00 |
RESIDENTIAL FEE | $148.44 |
MISCELLANEOUS PLUMBING FEES | $270.00 |
MISCELLANOUS MECHANICAL FEES | $146.00 |
CREDIT CARD FEE | $2.40 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $1.20 |
WATER METER DEPOSIT | $125.00 |
1 INCH PD METER | $410.00 |
2NDS/FRAMING 09/13/2018 WND | $30.00 |
INSULATION 09/17/2018 WND | $30.00 |
Total Fees: | $10,038.39 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ BRICK/WALL TIES |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ FLATWORK |
______ FLATWORK |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ INSULATION |
______ GAS RELEASE |
______ GAS RELEASE |
______ UTILITIES INSPECTION |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|