BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 7/29/2018
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B18-03545
|
JOB ADDRESS: 12990 TWELVE OAKS AVE FRISCO, TX 75035 |
DESC:
3904 AC, 4578 SF, SFR / 2 STORY |
|
OWNER:
RICHWOODS DEVELOPMENT COMPANY LLC
PLANO TX 75093-3839
|
CONTRACTOR:
LANDON HOMES
4050 W Park Blvd PLANO TX 75093
|
ISSUED DATE: 8/15/2018
APPLIED DATE:6/7/2018
EXPIRED DATE:11/18/2019
SITE APN:C2744897
STATUS:COMPLETED
|
|
APPLICANT:
LANDON HOMES
4050 W Park Blvd PLANO TX 75093
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 249495.84
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
1 INCH PD METER | $410.00 |
WATER METER DEPOSIT | $125.00 |
REPLACE DAMAGED/UNREADABLE REGISTER | $500.00 |
PLUMBMECHFINAL 05/14/2019 CI | $30.00 |
SEWER IMPACT FEE | $1,619.00 |
THOROUGHFARE IMPACT FEE | $2,358.00 |
WATER IMPACT FEE | $1,863.00 |
CREDIT CARD FEE | $1.60 |
CREDIT CARD FEE | $11.20 |
CREDIT CARD FEE | $0.60 |
2NDS/FRAMING 10/29/2018 GLQ | $30.00 |
RESIDENTIAL BUILDING PERMIT FEE | $1,743.75 |
FENCE FEE | $20.00 |
RESIDENTIAL FEE | $137.34 |
MISCELLANEOUS PLUMBING FEES | $242.00 |
MISCELLANOUS MECHANICAL FEES | $146.00 |
PLAN REVIEW FEE | $50.00 |
SET 1 PD METER 08/16/2018 JSB | $80.00 |
PLUMBTOPOUT/MECHRGH 10/23/2018 RR | $30.00 |
Total Fees: | $9,397.49 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ BRICK/WALL TIES |
______ DRY WALL |
______ WATER REGISTER |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ SWROWINSP |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ UTILITIES INSPECTION |
______ CO AND BUILDING FINAL |
______ CO AND BUILDING FINAL |
______ PLUMBING ROUGH-IN |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|