BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 6/22/2018
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B18-03483
|
JOB ADDRESS: 2160 FLAGSHIP CT FRISCO, TX |
DESC:
2192 AC, 2773 SF, SFR / 1 STORY |
|
OWNER:
PULTE HOMES OF TEXAS LP
IRVING TX 75063-2439
|
CONTRACTOR:
PULTE HOMES
IRVING TX 75063
|
ISSUED DATE: 7/25/2018
APPLIED DATE:6/8/2018
EXPIRED DATE:6/2/2019
SITE APN:D713101
STATUS:COMPLETED
|
|
APPLICANT:
PULTE HOMES
IRVING TX 75063
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 162948.24
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
REPLACE DAMAGED/UNREADABLE REGISTER | $500.00 |
GAS RELEASE 10/30/2018 CI | $30.00 |
RESIDENTIAL BUILDING PERMIT FEE | $1,308.75 |
FENCE FEE | $20.00 |
RESIDENTIAL FEE | $83.19 |
MISCELLANEOUS PLUMBING FEES | $191.00 |
MISCELLANOUS MECHANICAL FEES | $100.00 |
PLAN REVIEW FEE | $50.00 |
SEWER IMPACT FEE | $0.00 |
THOROUGHFARE IMPACT FEE | $0.00 |
WATER IMPACT FEE | $1,252.00 |
PLUMBTOPOUT/MECHRGH 09/10/2018 DOT | $30.00 |
CREDIT CARD FEE | $1.20 |
CREDIT CARD FEE | $1.00 |
CREDIT CARD FEE | $2.40 |
CREDIT CARD FEE | $10.00 |
CREDIT CARD FEE | $1.60 |
FLATWORK 11/13/2018 GLQ | $30.00 |
ELECTRICAL FINAL 10/30/2018 JWE2 | $30.00 |
ELECTRICAL FINAL 10/31/2018 JWE2 | $30.00 |
1 INCH PD METER | $410.00 |
WATER METER DEPOSIT | $125.00 |
UTILITIES INSPECTION 11/30/2018 NMN | $80.00 |
SLAB 08/06/2018 TWC | $30.00 |
Total Fees: | $4,316.14 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ T-POLE |
______ SLAB |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ INSULATION |
______ DRY WALL |
______ BRICK/WALL TIES |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ FLATWORK |
______ FLATWORK |
______ FLATWORK |
______ PLUMBMECHFINAL |
______ WATER REGISTER |
______ UTILITIES INSPECTION |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
______ UTILITIES INSPECTION |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|