Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 7/10/2018 PERMIT SUB-TYPE: MNEW PERMIT NO: B18-03460
JOB ADDRESS:
4545 MISSION AVE
FRISCO, TX
DESC:   571482 SQ FT, MNEW/ THE CANALS AT GRAND PARK PHASE III
OWNER:
CANALS AT GRAND PARK RESIDENTIAL III LLC

DALLAS TX 75219-4232

CONTRACTOR:
STREETLIGHTS RESIDENTIAL

DALLAS TX 75219
ISSUED DATE:
12/7/2018
APPLIED DATE:
5/30/2018
EXPIRED DATE:
4/3/2022
SITE APN:
D729050
STATUS:
COMPLETED
APPLICANT:
STREET LIGHTS CREATIVE STUDIO LLC

DALLAS TX 75219
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
64500000
FEE SUMMARY
INSPECTION SUMMARY
COMMERCIAL BUILDING PERMIT FEE$123,382.14
COMMERCIAL FEE$16,414.92
MISCELLANOUS MECHANICAL FEES$20,518.65
MISCELLANEOUS PLUMBING FEES$36,933.57
WATER IMPACT FEE$0.00
THOROUGHFARE IMPACT FEE$0.00
SEWER IMPACT FEE$0.00
FIRE DEPT INSPECTION FEES$50.00
PLUMBING ROUGH-IN 03/26/2019 SDC$30.00
6 INCH COMP METER$4,805.00
WATER METER DEPOSIT COMMERCIAL$1,125.00
PLUMBING ROUGH-IN 03/25/2019 SDC$35.00
FIRE DEPT INSPECTION FEES$50.00
FIRE DEPT INSPECTION FEES$2,154.00
FIRE DEPT INSPECTION FEES$17,144.46
FIRE DEPT INSPECTION FEES$50.00
CREDIT CARD FEE$1.30
WATER METER DEPOSIT COMMERCIAL$1,125.00
2 INCH T-10 METER$800.00
WATER METER DEPOSIT COMMERCIAL$1,125.00
2 INCH T-10 METER$800.00
WATER METER DEPOSIT COMMERCIAL$1,125.00
2 INCH T-10 METER$800.00
WATER METER DEPOSIT COMMERCIAL$1,125.00
2 INCH T-10 METER$800.00
WATER METER DEPOSIT COMMERCIAL$1,125.00
2 INCH T-10 METER$800.00
WATER METER DEPOSIT COMMERCIAL$1,125.00
2 INCH T-10 METER$800.00
WATER METER DEPOSIT COMMERCIAL$1,125.00
2 INCH T-10 METER$800.00
WATER METER DEPOSIT COMMERCIAL$1,125.00
2 INCH T-10 METER$800.00
WATER METER DEPOSIT COMMERCIAL$1,125.00
2 INCH T-10 METER$800.00
WATER METER DEPOSIT COMMERCIAL$1,125.00
2 INCH T-10 METER$800.00
CREDIT CARD FEE$1.00
Total Fees:$241,945.04
______  PLUMBING ROUGH-IN
______  T-POLE
______  UNDERGROUND ELEC
______  ELECTRICAL ROUGH IN
______  PRE POUR INSP
______  UNDERGROUND ELEC
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  UNDRGR FIRE MAIN VIS
______  UNDERGROUND ELEC
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  UNDERGROUND ELEC
______  COMM SLAB
______  MISC SLAB
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  UNDERGROUND ELEC
______  COMM SLAB
______  PLUMBING ROUGH-IN
______  COMM SLAB
______  COMM SLAB
______  PLUMBING ROUGH-IN
______  COMM SLAB
______  COMM SLAB
______  ELECTRICAL ROUGH IN
______  ELECT FINAL RES
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  COMM SLAB
______  COMM SLAB
______  PLUMBING ROUGH-IN
______  COMM SLAB
______  PLUMBING ROUGH-IN
______  COMM SLAB
______  ELECTRICAL ROUGH IN
______  COMM SLAB
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  COMM SLAB
______  COMM SLAB
______  UNDERGROUND ELEC
______  PLUMBING ROUGH-IN
______  COMM SLAB
______  ELECTRICAL ROUGH IN
______  COMM SLAB
______  COMM SLAB
______  METER PAYMENT
______  SET 6IN CMPND METER
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  METER PAYMENT
______  METER PAYMENT
______  METER PAYMENT
______  METER PAYMENT
______  METER PAYMENT
______  METER PAYMENT
______  METER PAYMENT
______  METER PAYMENT
______  METER PAYMENT
______  METER PAYMENT
______  FRAME COMM
______  INSULATION COMM
______  ELECT ROUGH COMM
______  SHEATHING COMM
______  ELECT WALL COMM
______  PLUMBING ROUGH-IN
______  SHEATHING COMM
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMB TOP OUT COMM
______  PLUMB TOP OUT COMM
______  MECHANICAL ROUGH
______  PLUMB TOP OUT COMM
______  PLUMB TOP OUT COMM
______  PLUMBING ROUGH-IN
______  ELECT ROUGH COMM
______  AUTOFIRE SPRK HYDRO
______  FRAME COMM
______  PLUMB TOP OUT COMM
______  PLUMB TOP OUT COMM
______  MECHANICAL ROUGH
______  ELECT WALL COMM
______  FIREINSULATION
______  MECHANICAL ROUGH
______  24HR AIR TEST
______  FRAME COMM
______  AUTOFIRE SPRK HYDRO
______  FRAME COMM
______  PLUMB TOP OUT COMM
______  FIREINSULATION
______  SLAB COMM
______  SLAB COMM
______  MECHANICAL ROUGH
______  INSULATION COMM
______  FIREINSULATION
______  MECHANICAL ROUGH
______  MECHANICAL ROUGH
______  BRICKWALL TIE COMM
______  ELECT ROUGH COMM
______  SLAB COMM
______  FRAME COMM
______  MECHANICAL ROUGH
______  MECHANICAL ROUGH
______  FRAME COMM
______  PLUMB TOP OUT COMM
______  MECHANICAL ROUGH
______  PLUMBING ROUGH-IN
______  FIREINSULATION
______  ELECT WALL COMM
______  AUTOFIRE SPRK HYDRO
______  SHEATHING COMM
______  ELECT RELEASE COMM
______  INSULATION COMM
______  MECHANICAL ROUGH
______  MECHANICAL ROUGH
______  MECHANICAL ROUGH
______  PLUMBING ROUGH-IN
______  FRAME COMM
______  CEILING
______  INSULATION COMM
______  MECHANICAL ROUGH
______  MECHANICAL ROUGH
______  MECHANICAL ROUGH
______  FRAME COMM
______  AUTO FIRE SPRINKLER
______  AUTOFIRE SPRK HYDRO
______  PLUMB TOP OUT COMM
______  FRAME COMM
______  SLAB COMM
______  BRICKWALL TIE COMM
______  PLUMB TOP OUT COMM
______  MECHANICAL ROUGH
______  MECHANICAL ROUGH
______  MECHANICAL ROUGH
______  MECHANICAL ROUGH
______  FRAME COMM
______  INSULATION COMM
______  AUTOFIRE SPRK HYDRO
______  BRICKWALL TIE COMM
______  MECHANICAL ROUGH
______  MECHANICAL ROUGH
______  FIREINSULATION
______  ELECT ROUGH COMM
______  ELECT RELEASE COMM
______  MECHANICAL ROUGH
______  MECHANICAL ROUGH
______  ELECT ROUGH COMM
______  PLUMB TOP OUT COMM
______  AUTOFIRE SPRK HYDRO
______  SHEATHING COMM
______  FRAME COMM
______  ELECT ROUGH COMM
______  FIREINSULATION
______  PLUMB TOP OUT COMM
______  INSULATION COMM
______  DRYWALL COMM
______  PLUMB TOP OUT COMM
______  ELECT RELEASE COMM
______  MECHANICAL ROUGH
______  FIREINSULATION
______  AUTOFIRE SPRK HYDRO
______  ELECT ROUGH COMM
______  FRAME COMM
______  MECHANICAL ROUGH
______  PLUMB TOP OUT COMM
______  FIRE PUMP ACCEPT
______  24HR AIR TEST
______  DRYWALL COMM
______  ELECT ROUGH COMM
______  FRAME COMM
______  INSULATION COMM
______  ELECT ROUGH COMM
______  FIREINSULATION
______  MECHANICAL ROUGH
______  ELECT ROUGH COMM
______  ELECT RELEASE COMM
______  MECHANICAL ROUGH
______  FIREINSULATION
______  MECHANICAL ROUGH
______  PLUMB TOP OUT COMM
______  INSULATION COMM
______  PLUMB TOP OUT COMM
______  MECHANICAL ROUGH
______  FRAME COMM
______  ELECT ROUGH RES
______  MECHANICAL ROUGH
______  MECHANICAL ROUGH
______  FIREINSULATION
______  INSULATION COMM
______  BRICKWALL TIE COMM
______  MECHANICAL ROUGH
______  INSULATION COMM
______  ELECT RELEASE COMM
______  INSULATION COMM
______  MECHANICAL ROUGH
______  INSULATION COMM
______  MECHANICAL ROUGH
______  INSULATION COMM
______  GAS PRESSURE
______  INSULATION COMM
______  INSULATION COMM
______  GAS PRESSURE
______  SET 2 T-10 METER
______  SET 2 T-10 METER
______  SET 2 T-10 METER
______  SET 2 T-10 METER
______  SET 2 T-10 METER
______  SET 2 T-10 METER
______  SET 2 T-10 METER
______  SET 2 T-10 METER
______  SET 2 T-10 METER
______  SET 2 T-10 METER
______  ELECT FINAL COMM
______  GAS RELEASE
______  PLUMBING FINAL
______  MECHANICAL FINAL
______  ELECT FINAL COMM
______  MECHANICAL FINAL
______  PLUMBING FINAL
______  PLUMBING FINAL
______  ELECT FINAL COMM
______  ELECT RELEASE COMM
______  LIFESAFETY
______  FIRE FINAL
______  COMM CO
______  ELECT RELEASE COMM
______  COMM CO
______  COMM CO
______  ELECT ROUGH COMM
______  PTO AND MECH ROUGH
______  AUTOFIRE SPRK PARTI
______  FRAME COMM
______  PLUMBING TOP OUT
______  PLUMBING TOP OUT
______  PLUMB TOP OUT COMM
______  INSULATION COMM
______  ELECT RELEASE COMM
______  ELECT RELEASE COMM
______  MECHANICAL FINAL
______  PLUMBING FINAL
______  ELECT FINAL COMM
______  FIRE FINAL
______  COMM CO
______  COMM CO
______  ELECT FINAL COMM
______  PLUMB MECH FINAL
______  FIRE FINAL
______  COMM CO
______  FIRE FINAL
______  MECHANICAL FINAL
______  PLUMBING FINAL
______  COMM CO
______  FIRE FINAL
______  MECHANICAL FINAL
______  PLUMBING FINAL
______  MECHANICAL FINAL
______  ELECT FINAL COMM
______  FIRE FINAL
______  COMM CO
______  MECHANICAL FINAL
______  PLUMBING FINAL
______  FIRE FINAL
______  ELECT FINAL COMM
______  COMM CO
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)