|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 6/14/2018
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B18-03450
|
JOB ADDRESS: 16342 BEDFORD FALLS LN FRISCO, TX |
DESC:
3564 AC, 4230 SF, SFR / 2 STORY |
|
OWNER:
MASTER DEVELOPERS-TCB2 LLC
PLANO TX 75093-4381
|
CONTRACTOR:
LENNAR HOMES
IRVING TX 75063
|
ISSUED DATE: 7/3/2018
APPLIED DATE:5/22/2018
EXPIRED DATE:9/24/2019
SITE APN:D684202
STATUS:COMPLETED
|
|
APPLICANT:
LENNAR HOMES
IRVING TX 75063
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 265910.04
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
ELECTRICAL FINAL 11/02/2018 ARG | $30.00 |
PLUMBMECHFINAL 01/24/2019 ARG | $30.00 |
REPLACE DAMAGED/UNREADABLE REGISTER | $500.00 |
RESIDENTIAL BUILDING PERMIT FEE | $1,823.75 |
FENCE FEE | $20.00 |
RESIDENTIAL FEE | $126.90 |
MISCELLANEOUS PLUMBING FEES | $256.00 |
MISCELLANOUS MECHANICAL FEES | $146.00 |
SEWER IMPACT FEE | $10.00 |
THOROUGHFARE IMPACT FEE | $0.00 |
WATER IMPACT FEE | $2,113.00 |
CREDIT CARD FEE | $14.60 |
CREDIT CARD FEE | $1.60 |
PLUMBMECHFINAL 12/27/2018 MLM | $30.00 |
UTILITIES INSPECTION 12/07/2018 NMN | $80.00 |
UTILITIES INSPECTION 03/19/2019 NMN | $80.00 |
DRY WALL 09/26/2018 VCS | $30.00 |
PLUMBMECHFINAL 01/25/2019 MLM | $30.00 |
WATER METER DEPOSIT | $125.00 |
1 INCH PD METER | $410.00 |
Total Fees: | $5,856.85 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ INSULATION |
______ BRICK/WALL TIES |
______ DRY WALL |
______ DRY WALL |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ UTILITIES INSPECTION |
______ WATER REGISTER |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ CO AND BUILDING FINAL |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ CO AND BUILDING FINAL |
______ CO AND BUILDING FINAL |
______ CO AND BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|