|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 6/21/2018
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B18-03352
|
JOB ADDRESS: 3986 FAIRBANKS DR FRISCO, TX |
DESC:
3097 AC, 4199 SF, SFR / 2 STORY |
|
OWNER:
DARLING FRISCO PARTNERS LTD
FRISCO TX 75034-5984
|
CONTRACTOR:
DARLING HOMES OF TEXAS LLC
FRISCO TX 75034
|
ISSUED DATE: 6/29/2018
APPLIED DATE:6/1/2018
EXPIRED DATE:10/16/2019
SITE APN:D693767
STATUS:COMPLETED
|
|
APPLICANT:
DARLING HOMES OF TEXAS LLC
FRISCO TX 75034
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 231067.17
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
REPLACE READABLE REGISTER | $290.00 |
CREDIT CARD FEE | $2.40 |
1 INCH PD METER | $410.00 |
WATER METER DEPOSIT | $125.00 |
UTILITIES INSPECTION 04/08/2019 NMN | $90.00 |
GAS RELEASE 02/22/2019 SDC | $30.00 |
2NDS/FRAMING 12/06/2018 TWC | $30.00 |
2NDS/FRAMING 12/17/2018 TWC | $30.00 |
WATER IMPACT FEE | $2,589.00 |
THOROUGHFARE IMPACT FEE | $4,827.00 |
SEWER IMPACT FEE | $2,081.00 |
PLAN REVIEW FEE | $50.00 |
MISCELLANOUS MECHANICAL FEES | $133.00 |
MISCELLANEOUS PLUMBING FEES | $228.00 |
RESIDENTIAL FEE | $125.97 |
FENCE FEE | $20.00 |
RESIDENTIAL BUILDING PERMIT FEE | $1,653.75 |
SHEATHING 11/29/2018 ARG | $30.00 |
Total Fees: | $12,745.12 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ T-POLE |
______ SLAB |
______ SHEATHING |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ 2NDS/FRAMING |
______ DRY WALL |
______ BRICK/WALL TIES |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ GAS RELEASE |
______ FLATWORK |
______ PLUMBMECHFINAL |
______ UTILITIES INSPECTION |
______ WATER REGISTER |
______ 2NDS AND FRAMING |
______ UTILITIES INSPECTION |
______ CO AND BUILDING FINAL |
______ CO AND BUILDING FINAL |
______ CO AND BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|