Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 5/19/2018 PERMIT SUB-TYPE: SNEW PERMIT NO: B18-02833
JOB ADDRESS:
6618 TITUS LN
FRISCO, TX
DESC:   3437AC, 4063 SF, SFR / 2 STORY
OWNER:
TOLL DALLAS TX LLC

GRAPEVINE TX 76051-7094

CONTRACTOR:
TOLL BROTHERS INC

Frisco TX 75034
ISSUED DATE:
5/30/2018
APPLIED DATE:
5/7/2018
EXPIRED DATE:
8/24/2019
SITE APN:
D705340
STATUS:
COMPLETED
APPLICANT:
TOLL BROTHERS INC

Frisco TX 75034
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
256434.57
FEE SUMMARY
INSPECTION SUMMARY
1 INCH PD METER$410.00
WATER METER DEPOSIT$125.00
REPLACE DAMAGED/UNREADABLE REGISTER$500.00
CREDIT CARD FEE$3.00
CREDIT CARD FEE$1.80
CREDIT CARD FEE$0.60
T-POLE 06/05/2018 JWF$30.00
UTILITIES INSPECTION 02/08/2019 NMN$80.00
2NDS/FRAMING 09/24/2018 TWC$30.00
PLUMBMECHFINAL 02/14/2019 WND$30.00
INSULATION 10/24/2018 JDR$30.00
GAS RELEASE 01/18/2019 RR$30.00
GAS RELEASE 01/11/2019 RR$30.00
GAS RELEASE 01/04/2019 RR$30.00
BRICK/WALL TIES 11/16/2018 JDR$30.00
BRICK/WALL TIES 11/14/2018 JDR$30.00
THOROUGHFARE IMPACT FEE$3,816.00
WATER IMPACT FEE$1,772.00
SEWER IMPACT FEE$0.00
CREDIT CARD FEE$11.60
MISCELLANOUS MECHANICAL FEES$139.50
MISCELLANEOUS PLUMBING FEES$256.00
RESIDENTIAL FEE$121.89
FENCE FEE$20.00
RESIDENTIAL BUILDING PERMIT FEE$1,778.75
Total Fees:$9,306.14
______  METER PAYMENT
______  T-POLE
______  T-POLE
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  SLAB
______  SHEATHING
______  PLUMBTOPOUT AND MECHRGH
______  2NDS/FRAMING
______  2NDS/FRAMING
______  INSULATION
______  INSULATION
______  DRY WALL
______  BRICK/WALL TIES
______  BRICK/WALL TIES
______  BRICK/WALL TIES
______  BRICK/WALL TIES
______  ELECTRICAL FINAL
______  GAS RELEASE
______  GAS RELEASE
______  GAS RELEASE
______  PLUMBTOPOUT AND MECHRGH
______  FLATWORK
______  GAS RELEASE
______  UTILITIES INSPECTION
______  WATER REGISTER
______  PLUMBMECHFINAL
______  UTILITIES INSPECTION
______  PLUMBMECHFINAL
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)