|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 5/25/2018
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B18-02711
|
JOB ADDRESS: 14786 DEVONSHIRE LN FRISCO, TX 75035 |
DESC:
4159 AC, 5258 SF, SFR / 2 STORY |
|
OWNER:
MASTER DEVELOPERS-SWB LLC
PLANO TX 75093-4381
|
CONTRACTOR:
SHADDOCK HOMES LTD
PLANO TX 75093
|
ISSUED DATE: 6/4/2018
APPLIED DATE:4/24/2018
EXPIRED DATE:3/26/2019
SITE APN:C2736806
STATUS:COMPLETED
|
|
APPLICANT:
SHADDOCK HOMES LTD
PLANO TX 75093
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 310302.99
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
BRICK/WALL TIES 07/23/2018 CCM | $30.00 |
RESIDENTIAL BUILDING PERMIT FEE | $2,048.75 |
FENCE FEE | $20.00 |
RESIDENTIAL FEE | $157.74 |
MISCELLANEOUS PLUMBING FEES | $263.00 |
MISCELLANOUS MECHANICAL FEES | $185.00 |
PLUMBTOPOUT/MECHRGH 07/12/2018 DE | $30.00 |
WATER IMPACT FEE | $1,797.00 |
THOROUGHFARE IMPACT FEE | $3,280.00 |
SEWER IMPACT FEE | $1,619.00 |
CREDIT CARD FEE | $2.40 |
CREDIT CARD FEE | $7.10 |
2NDS/FRAMING 07/19/2018 JDR | $30.00 |
2NDS/FRAMING 07/20/2018 JDR | $30.00 |
1 INCH PD METER | $410.00 |
WATER METER DEPOSIT | $125.00 |
UTILITIES INSPECTION 09/05/2018 NMN | $80.00 |
REPLACE READABLE REGISTER | $275.00 |
Total Fees: | $10,389.99 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ BRICK/WALL TIES |
______ 2NDS/FRAMING |
______ BRICK/WALL TIES |
______ INSULATION |
______ DRY WALL |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ UTILITIES INSPECTION |
______ WATER REGISTER |
______ UTILITIES INSPECTION |
______ GAS RELEASE |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|