Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 5/2/2018 PERMIT SUB-TYPE: SNEW PERMIT NO: B18-02525
JOB ADDRESS:
13799 KEVIN DR
FRISCO, TX 75035
DESC:   2717 AC, 3708 SF, SFR / 1 STORY
OWNER:
GEHAN HOMES LTD
C/O BARTON CREEK PLAZA III
AUSTIN TX 78704-6652

CONTRACTOR:
GEHAN HOMES LTD
15725 North Dallas Pkwy ste 300
FRISCO TX 75035
ISSUED DATE:
6/26/2018
APPLIED DATE:
4/12/2018
EXPIRED DATE:
12/16/2019
SITE APN:
C2714903
STATUS:
COMPLETED
APPLICANT:
GEHAN HOMES LTD
15725 North Dallas Pkwy ste 300
FRISCO TX 75035
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
202715.37
FEE SUMMARY
INSPECTION SUMMARY
PLUMBTOPOUT/MECHRGH 09/06/2018 ARG$30.00
PLUMBTOPOUT/MECHRGH 09/10/2018 ARG$30.00
SLAB 07/23/2018 CCM$30.00
SHEATHING 11/08/2018 CCM$30.00
PLUMBTOPOUT/MECHRGH 11/12/2018 CK$30.00
RESIDENTIAL BUILDING PERMIT FEE$1,508.75
FENCE FEE$20.00
RESIDENTIAL FEE$111.24
MISCELLANEOUS PLUMBING FEES$219.00
MISCELLANOUS MECHANICAL FEES$113.00
MISCELLANEOUS PLUMBING FEES$7.00
PLAN REVIEW FEE$50.00
DRY WALL 02/04/2019 DE$30.00
WATER IMPACT FEE$1,772.00
THOROUGHFARE IMPACT FEE$3,280.00
SEWER IMPACT FEE$1,619.00
CREDIT CARD FEE$1.80
CREDIT CARD FEE$0.60
SLAB 07/24/2018 JDR$30.00
SLAB 07/25/2018 JDR$30.00
FLATWORK 07/26/2018 JDR$30.00
1 INCH PD METER$410.00
WATER METER DEPOSIT$125.00
GAS RELEASE 04/04/2019 MLM$30.00
INSULATION 01/29/2019 JWE2$30.00
PLUMBMECHFINAL 05/17/2019 WND$30.00
Total Fees:$9,597.39
______  METER PAYMENT
______  SET 1 PD METER
______  T-POLE
______  PLUMBING ROUGH-IN
______  SLAB
______  SLAB
______  SLAB
______  SLAB
______  FLATWORK
______  FLATWORK
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  ELECTRICAL ROUGH IN
______  PLUMBTOPOUT AND MECHRGH
______  SHEATHING
______  PLUMBTOPOUT AND MECHRGH
______  SHEATHING
______  FLATWORK
______  ELECTRICAL ROUGH IN
______  PLUMBTOPOUT AND MECHRGH
______  SHEATHING
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  2NDS/FRAMING
______  2NDS/FRAMING
______  BRICK/WALL TIES
______  BRICK/WALL TIES
______  INSULATION
______  INSULATION
______  INSULATION
______  2NDS/FRAMING
______  LATH
______  DRY WALL
______  DRY WALL
______  ELECTRICAL FINAL
______  GAS RELEASE
______  GAS RELEASE
______  UTILITIES INSPECTION
______  PLUMBMECHFINAL
______  PLUMBMECHFINAL
______  PLUMBMECHFINAL
______  PLUMBMECHFINAL
______  CO AND BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)