|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 5/1/2018
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B18-02168
|
JOB ADDRESS: 11760 YOAKUM DR FRISCO, TX 75035 |
DESC:
3370 AC, 3940 SF,SFR/ 2 STORY |
|
OWNER:
SUMEER HOMES INC
IRVING TX 75062-7075
|
CONTRACTOR:
SUMEER HOMES
2404 Texas drive IRVING TX 75062
|
ISSUED DATE: 5/18/2018
APPLIED DATE:4/5/2018
EXPIRED DATE:1/15/2020
SITE APN:C2554422
STATUS:COMPLETED
|
|
APPLICANT:
SUMEER HOMES
2404 Texas drive IRVING TX 75062
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 251435.7
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
1 INCH PD METER | $410.00 |
WATER METER DEPOSIT | $125.00 |
2NDS/FRAMING 12/21/2018 ARG | $30.00 |
2NDS/FRAMING 01/03/2019 ARG | $30.00 |
INSULATION 01/10/2019 ARG | $30.00 |
INSULATION 01/11/2019 ARG | $30.00 |
REPLACE DAMAGED/UNREADABLE REGISTER | $500.00 |
T-POLE 06/08/2018 CCM | $30.00 |
SLAB 07/19/2018 CCM | $30.00 |
SLAB 07/20/2018 CCM | $30.00 |
RESIDENTIAL BUILDING PERMIT FEE | $1,753.75 |
FENCE FEE | $20.00 |
RESIDENTIAL FEE | $118.20 |
MISCELLANEOUS PLUMBING FEES | $256.00 |
MISCELLANOUS MECHANICAL FEES | $139.50 |
CREDIT CARD FEE | $2.40 |
CREDIT CARD FEE | $3.00 |
CREDIT CARD FEE | $20.20 |
CREDIT CARD FEE | $0.60 |
PLUMBING ROUGH-IN 07/05/2018 MRT | $30.00 |
UTILITIES INSPECTION 05/14/2019 NMN | $90.00 |
UTILITIES INSPECTION 05/20/2019 NMN | $90.00 |
UTILITIES INSPECTION 06/20/2019 NMN | $90.00 |
UTILITIES INSPECTION 06/27/2019 NMN | $90.00 |
PLUMBMECHFINAL 07/12/2019 RR | $30.00 |
GAS RELEASE 04/03/2019 SDC | $30.00 |
GAS RELEASE 04/04/2019 SDC | $30.00 |
GAS RELEASE 04/04/2019 SDC | $30.00 |
FLATWORK 03/18/2019 TWC | $30.00 |
2NDS/FRAMING 12/31/2018 VCS | $30.00 |
GAS RELEASE 03/28/2019 WND | $30.00 |
Total Fees: | $4,158.65 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ T-POLE |
______ SLAB |
______ SLAB |
______ SLAB |
______ SLAB |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ DRY WALL |
______ BRICK/WALL TIES |
______ GAS RELEASE |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ FLATWORK |
______ FLATWORK |
______ FLATWORK |
______ GAS RELEASE |
______ GAS RELEASE |
______ GAS RELEASE |
______ GAS RELEASE |
______ GAS RELEASE |
______ UTILITIES INSPECTION |
______ WATER REGISTER |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ CO AND BUILDING FINAL |
______ CO AND BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|