Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 4/16/2018 PERMIT SUB-TYPE: SADD PERMIT NO: B18-02000
JOB ADDRESS:
7159 MAPLE ST
FRISCO, TX 75033
DESC:   400 SQ FT, SADD 285 SF / REMODEL
OWNER:
BRAATZ DONALD

FRISCO TX 75033-3406

CONTRACTOR:
HOUSE PROUD

DENISON TX 75021
ISSUED DATE:
4/16/2018
APPLIED DATE:
4/5/2018
EXPIRED DATE:
5/28/2019
SITE APN:
C947159
STATUS:
EXPIRED
APPLICANT:
HOUSE PROUD

DENISON TX 75021
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
50000
FEE SUMMARY
INSPECTION SUMMARY
RESIDENTIAL BUILDING PERMIT FEE$643.75
RESIDENTIAL FEE$30.00
MISCELLANEOUS PLUMBING FEES$65.00
MISCELLANOUS MECHANICAL FEES$43.00
GAS RELEASE 04/25/2018 DOT$30.00
CREDIT CARD FEE$1.80
MISC SLAB 04/27/2018 GLQ$30.00
T-POLE 04/27/2018 GLQ$30.00
ELECTRICAL FINAL 07/02/2018 VCS$30.00
Total Fees:$903.55
______  PLUMBING ROUGH-IN
______  ELECTRICAL FINAL
______  PLUMBING ROUGH-IN
______  GAS RELEASE
______  MISC SLAB
______  T-POLE
______  MISC SLAB
______  T-POLE
______  MISC SLAB
______  PLUMBING ROUGH-IN
______  ELECTRICAL RELEASE
______  PLUMBING ROUGH-IN
______  ELECTRICAL ROUGH IN
______  PLUMBING TOP OUT
______  MISCFRAME
______  MISCFRAME
______  MECHANICAL ROUGH
______  MECHANICAL ROUGH
______  GAS RELEASE
______  INSULATION
______  ELECTRICAL ROUGH IN
______  ELECTRICAL FINAL
______  DRY WALL
______  ELECTRICAL FINAL
______  PLUMBMECHFINAL
______  PLUMBING FINAL
______  MISC FINAL
______  MISC FINAL
______  MISC
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)