APPROVED DATE: 4/6/2018 PERMIT SUB-TYPE: SNEW PERMIT NO: B18-01732
JOB ADDRESS:
6246 RILLA ST
FRISCO, TX 75035
DESC:   1728 AC,2166 SF, SFR / 2 STORY
OWNER:
MEGATEL GABLES LLC

DALLAS TX 75234-8923

CONTRACTOR:
MEGATEL HOMES INC

FARMERS BRANCH TX 75234
ISSUED DATE:
4/9/2018
APPLIED DATE:
3/23/2018
EXPIRED DATE:
7/19/2020
SITE APN:
C2738794
STATUS:
COMPLETED
APPLICANT:
MEGATEL HOMES INC

FARMERS BRANCH TX 75234
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
125792.46
FEE SUMMARY
INSPECTION SUMMARY
PLUMBMECHFINAL 09/26/2019 AMM2$30.00
REPLACE DAMAGED/UNREADABLE REGISTER$500.00
WATER IMPACT FEE$1,939.00
SEWER IMPACT FEE$1,619.00
RESIDENTIAL BUILDING PERMIT FEE$1,123.75
FENCE FEE$20.00
RESIDENTIAL FEE$64.98
MISCELLANEOUS PLUMBING FEES$205.00
MISCELLANOUS MECHANICAL FEES$113.00
FIRE DEPT INSPECTION FEES$64.98
1 INCH PD METER$410.00
WATER METER DEPOSIT$125.00
PLUMBTOPOUT/MECHRGH 11/30/2018 MRT$30.00
GAS RELEASE 08/01/2019 MRT$30.00
UTILITIES INSPECTION 09/18/2019 NMN$90.00
UTILITIES INSPECTION 09/27/2019 NMN$90.00
PLUMBTOPOUT/MECHRGH 11/21/2018 RR$30.00
ELECTRICAL FINAL 08/01/2019 RWT$30.00
PLUMBTOPOUT/MECHRGH 12/03/2018 SDC$30.00
GAS RELEASE 08/05/2019 SDC$30.00
2NDS/FRAMING 12/17/2018 VCS$30.00
2NDS/FRAMING 12/19/2018 VCS$30.00
PLUMBTOPOUT/MECHRGH 12/10/2018 WND$30.00
Total Fees:$6,664.71
______  METER PAYMENT
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SLAB RES
______  SLAB RES
______  T-POLE
______  T-POLE
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  AUTOFIRE SPRK HYDRO
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  ELECTRICAL ROUGH IN
______  2NDS/FRAMING
______  2NDS/FRAMING
______  2NDS/FRAMING
______  2NDS/FRAMING
______  BRICK/WALL TIES
______  BRICK AND WALL TIES
______  INSULATION RES
______  INSULATION RES
______  INSULATION RES
______  DRY WALL
______  DRY WALL
______  WATER REGISTER
______  FLATWORK
______  FLATWORK
______  FLATWORK
______  GAS RELEASE
______  ELECT FINAL RES
______  GAS RELEASE
______  ELECT FINAL RES
______  GAS RELEASE
______  ELECT FINAL RES
______  GAS RELEASE
______  UTILITIES INSPECTION
______  PLUMB MECH FINAL
______  UTILITIES INSPECTION
______  PLUMB MECH FINAL
______  UTILITIES INSPECTION
______  PLUMB MECH FINAL
______  UTILITIES INSPECTION
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)