|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 4/3/2018
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B18-01588
|
JOB ADDRESS: 11466 LA SALLE RD FRISCO, TX 75035 |
DESC:
3899 AC, 5014 SF, SFR / 2 STORY |
|
OWNER:
DUNHILL HOMES DFW LLC
DALLAS TX 75244-5087
|
CONTRACTOR:
DUNHILL HOMES DFW LLC
4835 LBJ FWY STE 700 DALLAS TX 75244
|
ISSUED DATE: 4/4/2018
APPLIED DATE:3/15/2018
EXPIRED DATE:9/3/2019
SITE APN:C2722270
STATUS:COMPLETED
|
|
APPLICANT:
DUNHILL HOMES DFW LLC
4835 LBJ FWY STE 700 DALLAS TX 75244
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 290904.39
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
ELECTRICAL FINAL 12/03/2018 ARG | $30.00 |
FLATWORK 12/13/2018 ARG | $30.00 |
SLAB 06/13/2018 CCM | $30.00 |
SLAB 06/20/2018 CCM | $30.00 |
SLAB 06/22/2018 CCM | $30.00 |
2NDS/FRAMING 09/20/2018 CCM | $30.00 |
2NDS/FRAMING 09/24/2018 CCM | $30.00 |
PLUMBTOPOUT/MECHRGH 09/06/2018 CI | $30.00 |
PLUMBMECHFINAL 03/04/2019 CI | $30.00 |
RESIDENTIAL BUILDING PERMIT FEE | $1,948.75 |
FENCE FEE | $20.00 |
RESIDENTIAL FEE | $150.42 |
MISCELLANEOUS PLUMBING FEES | $284.00 |
MISCELLANOUS MECHANICAL FEES | $146.00 |
2NDS/FRAMING 09/26/2018 DE | $30.00 |
THOROUGHFARE IMPACT FEE | $806.00 |
SEWER IMPACT FEE | $0.00 |
WATER IMPACT FEE | $0.00 |
CREDIT CARD FEE | $67.10 |
CREDIT CARD FEE | $1.80 |
CREDIT CARD FEE | $1.80 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $1.20 |
CREDIT CARD FEE | $10.00 |
CREDIT CARD FEE | $1.60 |
CREDIT CARD FEE | $1.80 |
REPLACE DAMAGED/UNREADABLE REGISTER | $500.00 |
1 INCH PD METER | $410.00 |
WATER METER DEPOSIT | $125.00 |
PLUMBMECHFINAL 02/26/2019 MLM | $30.00 |
UTILITIES INSPECTION 02/20/2019 NMN | $80.00 |
PLUMBMECHFINAL 03/01/2019 WND | $30.00 |
Total Fees: | $4,916.07 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ SLAB |
______ SLAB |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ DRY WALL |
______ DRY WALL |
______ BRICK/WALL TIES |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ FLATWORK |
______ FLATWORK |
______ FLATWORK |
______ GAS RELEASE |
______ WATER REGISTER |
______ UTILITIES INSPECTION |
______ PLUMBMECHFINAL |
______ UTILITIES INSPECTION |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ CO AND BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|