|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 3/27/2018
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B18-01344
|
JOB ADDRESS: 631 THOROUGHBRED AVE FRISCO, TX |
DESC:
3517 AC, 4310 SF, SFR / 2 STORY |
|
OWNER:
FRISCO 39 LLC
AUSTIN TX 78750-1241
|
CONTRACTOR:
BRITTON HOMES / PERRY HOMES CO
9000 Gulf Freeway Houston TX 77017
|
ISSUED DATE: 4/2/2018
APPLIED DATE:3/6/2018
EXPIRED DATE:6/5/2019
SITE APN:D695571
STATUS:COMPLETED
|
|
APPLICANT:
BRITTON HOMES / PERRY HOMES CO
9000 Gulf Freeway Houston TX 77017
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 262403.37
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
PLUMBTOPOUT/MECHRGH 06/11/2018 ARG | $30.00 |
SEWER IMPACT FEE | $0.00 |
THOROUGHFARE IMPACT FEE | $3,816.00 |
WATER IMPACT FEE | $0.00 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $2.20 |
CREDIT CARD FEE | $1.20 |
RESIDENTIAL BUILDING PERMIT FEE | $1,808.75 |
FENCE FEE | $20.00 |
RESIDENTIAL FEE | $129.30 |
MISCELLANEOUS PLUMBING FEES | $270.00 |
MISCELLANOUS MECHANICAL FEES | $152.50 |
2NDS/FRAMING 06/14/2018 JWF | $30.00 |
1 INCH PD METER | $410.00 |
WATER METER DEPOSIT | $125.00 |
UTILITIES INSPECTION 10/05/2018 NMN | $80.00 |
SHEATHING 05/30/2018 VCS | $30.00 |
PLUMBMECHFINAL 10/16/2018 WND | $30.00 |
Total Fees: | $6,935.55 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ T-POLE |
______ SLAB |
______ SHEATHING |
______ SHEATHING |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ INSULATION |
______ 2NDS/FRAMING |
______ DRY WALL |
______ BRICK/WALL TIES |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ UTILITIES INSPECTION |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ UTILITIES INSPECTION |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|