Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 4/22/2019 PERMIT SUB-TYPE: SNEW PERMIT NO: B18-01277
JOB ADDRESS:
6049 CHAMBERLYNE DR
FRISCO, TX 75034
DESC:   15221 AC, 19585 SF, SFR / 2 STORY
OWNER:
PREMIER FAMILY LTD PARTNERSHIP

FRISCO TX 75034-2220

CONTRACTOR:
ZAIM NEWAZ

FRISCO TX 75035
ISSUED DATE:
6/24/2019
APPLIED DATE:
3/1/2018
EXPIRED DATE:
9/23/2024
SITE APN:
ADD65864
STATUS:
COMPLETED
APPLICANT:
ZAIM NEWAZ

FRISCO TX 75035
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
1135638.81
FEE SUMMARY
INSPECTION SUMMARY
2NDS AND FRAMING 06/01/2021 CCM$30.00
REPLACEMENT CARD FEE$10.00
RESIDENTIAL PLUMBING FEE$480.00
RESIDENTIAL MECHANICAL FEE$302.00
RESIDENTIAL BUILDING PERMIT FEE$5,862.10
FENCE FEE$20.00
RESIDENTIAL FEE$587.55
PLAN REVIEW FEE$50.00
PLAN REVIEW FEE$100.00
PLAN REVIEW FEE$50.00
THOROUGHFARE IMPACT FEE$0.00
SEWER IMPACT FEE$0.00
WATER IMPACT FEE$0.00
DRYWALL RES 10/26/2021 DW2$30.00
DRYWALL RES 10/27/2021 DW2$30.00
CREDIT CARD FEE$1.20
CREDIT CARD FEE$0.60
CREDIT CARD FEE$9.13
CREDIT CARD FEE$2.80
PERCENT CREDIT CARD FEE$11.80
PERCENT CREDIT CARD FEE$0.60
PERCENT CREDIT CARD FEE$19.80
REPLACE DAMAGED/UNREADABLE REGISTER$500.00
ELECT ROUGH RES 04/19/2021 JDR$30.00
ELECT ROUGH RES 05/03/2021 JDR$30.00
FLATWORK RES 11/28/2022 JDR$30.00
PLUMB MECH FINAL 07/19/2023 JR2$30.00
PLAN REVIEW FEE$50.00
1 INCH PD METER$435.00
WATER METER DEPOSIT$125.00
FIRE DEPT INSPECTION FEES$456.63
FLATWORK RES 07/19/2023 RWK$30.00
ELECT FINAL RES 07/26/2023 RWK$30.00
PLUMBING ROUGH-IN 01/31/2020 SMH$30.00
PLUMBING ROUGH-IN 02/27/2020 SMH$30.00
PTO AND MECH ROUGH 04/28/2021 SMH$30.00
UTILITIES INSPECTION 09/07/2023 TL$100.00
REPLACE DAMAGED/UNREADABLE REGISTER$500.00
UTILITIES INSPECTION 10/13/2023 TL$100.00
UTILITIES INSPECTION 10/17/2023 TL$100.00
UTILITIES INSPECTION 10/19/2023 TL$100.00
PLUMBING ROUGH-IN 02/03/2020 WND$30.00
Total Fees:$10,364.21
______  METER PAYMENT
______  SET 1 PD METER
______  T-POLE RES
______  PIER RES
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  FLATWORK RES
______  FLATWORK RES
______  MISC SLAB RES
______  SLAB RES
______  T-POLE RES
______  SHEATHING RES
______  BRICKWALL TIES RES
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  ELECT ROUGH RES
______  AUTOFIRE SPRK HYDRO
______  PTO AND MECH ROUGH
______  ELECT ROUGH RES
______  ELECT ROUGH RES
______  ELECT ROUGH RES
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  LATH RES
______  WATER REGISTER
______  BRICKWALL TIES RES
______  INSULATION RES
______  INSULATION RES
______  INSULATION RES
______  DRYWALL RES
______  DRYWALL RES
______  DRYWALL RES
______  DRYWALL RES
______  DRYWALL RES
______  FLATWORK RES
______  FLATWORK RES
______  RETAIN WALL RES
______  ELECT RELEASE RES
______  GAS RELEASE
______  PLUMB MECH FINAL
______  FLATWORK RES
______  PLUMB MECH FINAL
______  FLATWORK RES
______  ELECT FINAL RES
______  ELECT FINAL RES
______  ELECT FINAL RES
______  FLATWORK RES
______  PLUMB MECH FINAL
______  PLUMB MECH FINAL
______  PLUMB MECH FINAL
______  CO AND BUILD FINAL
______  UTILITIES INSPECTION
______  WATER REGISTER
______  UTILITIES INSPECTION
______  UTILITIES INSPECTION
______  UTILITIES INSPECTION
______  CO AND BUILD FINAL
______  UTILITIES INSPECTION
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)