Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 3/29/2018 PERMIT SUB-TYPE: SNEW PERMIT NO: B18-01075
JOB ADDRESS:
6234 RAINBOW VALLEY PL
FRISCO, TX 75035
DESC:   1720 AC, 2188 SF, SFR / 2 STORY
OWNER:
MEGATEL GABLES LLC

DALLAS TX 75234-8923

CONTRACTOR:
MEGATEL HOMES INC

FARMERS BRANCH TX 75234
ISSUED DATE:
3/30/2018
APPLIED DATE:
2/22/2018
EXPIRED DATE:
8/2/2020
SITE APN:
C2738841
STATUS:
COMPLETED
APPLICANT:
MEGATEL HOMES INC

FARMERS BRANCH TX 75234
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
128329.2
FEE SUMMARY
INSPECTION SUMMARY
REPLACE READABLE REGISTER$290.00
GAS RELEASE 03/21/2019 CK$35.00
WATER IMPACT FEE$1,939.00
SEWER IMPACT FEE$1,619.00
PLUMBTOPOUT/MECHRGH 08/23/2018 DOT$30.00
CREDIT CARD FEE$0.60
2NDS/FRAMING 10/04/2018 GLQ$30.00
RESIDENTIAL BUILDING PERMIT FEE$1,138.75
FENCE FEE$20.00
RESIDENTIAL FEE$65.64
MISCELLANEOUS PLUMBING FEES$205.00
MISCELLANOUS MECHANICAL FEES$113.00
WATER METER DEPOSIT$125.00
1 INCH PD METER$410.00
UTILITIES INSPECTION 09/20/2019 NMN$90.00
FIRE DEPT INSPECTION FEES$65.64
SLAB 05/29/2018 WND$30.00
Total Fees:$6,206.63
______  METER PAYMENT
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SLAB RES
______  SLAB RES
______  SLAB RES
______  T-POLE
______  T-POLE
______  T-POLE
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  AUTOFIRE SPRK HYDRO
______  2NDS/FRAMING
______  2NDS/FRAMING
______  INSULATION RES
______  DRY WALL
______  BRICK/WALL TIES
______  FLATWORK
______  ELECT FINAL RES
______  GAS RELEASE
______  GAS RELEASE
______  PLUMB MECH FINAL
______  UTILITIES INSPECTION
______  WATER REGISTER
______  CO AND BUILD FINAL
______  UTILITIES INSPECTION
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
______  PTO AND MECH ROUGH
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)