|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 3/29/2018
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B18-01075
|
JOB ADDRESS: 6234 RAINBOW VALLEY PL FRISCO, TX 75035 |
DESC:
1720 AC, 2188 SF, SFR / 2 STORY |
|
OWNER:
MEGATEL GABLES LLC
DALLAS TX 75234-8923
|
CONTRACTOR:
MEGATEL HOMES INC
FARMERS BRANCH TX 75234
|
ISSUED DATE: 3/30/2018
APPLIED DATE:2/22/2018
EXPIRED DATE:8/2/2020
SITE APN:C2738841
STATUS:COMPLETED
|
|
APPLICANT:
MEGATEL HOMES INC
FARMERS BRANCH TX 75234
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 128329.2
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
REPLACE READABLE REGISTER | $290.00 |
GAS RELEASE 03/21/2019 CK | $35.00 |
WATER IMPACT FEE | $1,939.00 |
SEWER IMPACT FEE | $1,619.00 |
PLUMBTOPOUT/MECHRGH 08/23/2018 DOT | $30.00 |
CREDIT CARD FEE | $0.60 |
2NDS/FRAMING 10/04/2018 GLQ | $30.00 |
RESIDENTIAL BUILDING PERMIT FEE | $1,138.75 |
FENCE FEE | $20.00 |
RESIDENTIAL FEE | $65.64 |
MISCELLANEOUS PLUMBING FEES | $205.00 |
MISCELLANOUS MECHANICAL FEES | $113.00 |
WATER METER DEPOSIT | $125.00 |
1 INCH PD METER | $410.00 |
UTILITIES INSPECTION 09/20/2019 NMN | $90.00 |
FIRE DEPT INSPECTION FEES | $65.64 |
SLAB 05/29/2018 WND | $30.00 |
Total Fees: | $6,206.63 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ SLAB RES |
______ SLAB RES |
______ T-POLE |
______ T-POLE |
______ T-POLE |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ AUTOFIRE SPRK HYDRO |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION RES |
______ DRY WALL |
______ BRICK/WALL TIES |
______ FLATWORK |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ GAS RELEASE |
______ PLUMB MECH FINAL |
______ UTILITIES INSPECTION |
______ WATER REGISTER |
______ CO AND BUILD FINAL |
______ UTILITIES INSPECTION |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
______ PTO AND MECH ROUGH |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|