APPROVED DATE: 5/2/2018
|
PERMIT SUB-TYPE: CIFO
|
PERMIT NO: B18-00793
|
JOB ADDRESS: 6363 DALLAS PKWY BLDG TWO 208 FRISCO, TX 75034 |
DESC:
1119 SQ FT, CIFO / I FRATELLI PIZZA |
|
OWNER:
STONEBROOK PLAZA LLC
C/O PROACTIVE GROUP LLC FRISCO TX 75034-5934
|
CONTRACTOR:
CRAWFORD CONSTRUCTION LLC
CARROLLTON TX 75010
|
ISSUED DATE: 5/16/2018
APPLIED DATE:3/5/2018
EXPIRED DATE:6/17/2019
SITE APN:C2024451
STATUS:COMPLETED
|
|
APPLICANT:
CRAWFORD CONSTRUCTION LLC
CARROLLTON TX 75010
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 136768
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
CREDIT CARD FEE | $1.00 |
CREDIT CARD FEE | $0.70 |
SLAB 06/08/2018 CW | $35.00 |
PLUMBING TOP OUT 06/22/2018 DOT | $35.00 |
CREDIT CARD FEE | $1.70 |
CREDIT CARD FEE | $0.70 |
CREDIT CARD FEE | $0.70 |
CREDIT CARD FEE | $0.70 |
COMMERCIAL FEE | $50.00 |
COMMERCIAL BUILDING PERMIT FEE | $707.25 |
MISCELLANOUS MECHANICAL FEES | $86.00 |
MISCELLANEOUS PLUMBING FEES | $130.00 |
COMMERCIAL FEE | $74.00 |
FIRE DEPT INSPECTION FEES | $50.00 |
GAS PRESSURE 08/29/2018 MLM | $35.00 |
PLUMBING FINAL 09/19/2018 MLM | $30.00 |
PLUMBING ROUGH-IN 05/23/2018 MRT | $35.00 |
GAS RELEASE 11/07/2018 SDC | $35.00 |
FIRE DEPT INSPECTION FEES | $50.00 |
Total Fees: | $1,357.75 |
|
|
| ______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ MECHANICAL ROUGH |
______ SLAB |
______ ELECTRICAL ROUGH IN |
______ COMM FRAME |
______ PLUMBING TOP OUT |
______ COMM FRAME |
______ PLUMBING TOP OUT |
______ CEILING |
______ INSULATION |
______ MECHANICAL ROUGH |
______ GAS PRESSURE |
______ ELECTRICAL RELEASE |
______ GAS PRESSURE |
______ AUTOFIRE SPRK HYDRO |
______ PLUMBING FINAL |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ GAS RELEASE |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ HEALTH FINAL |
______ FIRE FINAL |
______ FIRE FINAL |
______ MECHANICAL FINAL |
______ COMM CO |
______ COMM CO |
______ FIRE FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|