Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 5/8/2018 PERMIT SUB-TYPE: SNEW PERMIT NO: B18-00694
JOB ADDRESS:
2313 BUNNELS FORK RD
FRISCO, TX
DESC:   4479 AC, 5147 SF, SFR / 2 STORY
OWNER:
CALATLANTIC HOMES OF TEXAS INC

FRISCO TX 75034-6015

CONTRACTOR:
LENNAR HOMES
14638 PENSHAM DR
FRISCO TX 75034
ISSUED DATE:
5/25/2018
APPLIED DATE:
4/20/2018
EXPIRED DATE:
12/25/2019
SITE APN:
D701907
STATUS:
COMPLETED
APPLICANT:
CALATLANTIC HOMES

IRVING TX 75039
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
334178.19
FEE SUMMARY
INSPECTION SUMMARY
SET 1 PD METER 10/01/2018 DLK$80.00
PLUMBING ROUGH-IN 10/30/2018 CI$30.00
PLUMBING ROUGH-IN 11/02/2018 CI$30.00
PLUMBING ROUGH-IN 11/06/2018 CI$30.00
GAS RELEASE 06/07/2019 CK$30.00
GAS RELEASE 06/11/2019 CK$30.00
REPLACE DAMAGED/UNREADABLE REGISTER$500.00
CREDIT CARD FEE$2.80
CREDIT CARD FEE$0.60
CREDIT CARD FEE$2.40
CREDIT CARD FEE$2.60
CREDIT CARD FEE$12.40
CREDIT CARD FEE$1.20
SLAB 12/03/2018 JDW2$30.00
SLAB 12/05/2018 JDW2$30.00
SLAB 12/06/2018 JDW2$30.00
1 INCH PD METER$410.00
WATER METER DEPOSIT$125.00
PLUMBING ROUGH-IN 11/15/2018 MLM$30.00
PLUMBTOPOUT AND MECHRGH 03/13/2019 RR$30.00
PLUMBTOPOUT AND MECHRGH 03/19/2019 RR$30.00
PLUMBTOPOUT AND MECHRGH 03/27/2019 RR$30.00
REPLACEMENT CARD FEE$10.00
FLATWORK 05/17/2019 VCS$30.00
DRY WALL 04/23/2019 VCS$30.00
INSULATION 04/15/2019 VCS$30.00
2NDS AND FRAMING 04/10/2019 VCS$30.00
2NDS AND FRAMING 04/04/2019 VCS$30.00
CREDIT CARD FEE$34.20
SEWER IMPACT FEE$1,619.00
THOROUGHFARE IMPACT FEE$3,816.00
WATER IMPACT FEE$1,772.00
MISCELLANOUS MECHANICAL FEES$146.00
MISCELLANEOUS PLUMBING FEES$291.00
RESIDENTIAL FEE$162.27
FENCE FEE$20.00
RESIDENTIAL BUILDING PERMIT FEE$2,168.75
UTILITIES INSPECTION 06/25/2019 NMN$90.00
UTILITIES INSPECTION 06/21/2019 NMN$90.00
1 INCH CURBSTOP REPAIR / REPLACE$350.00
UTILITIES INSPECTION 06/19/2019 NMN$90.00
UTILITIES INSPECTION 06/14/2019 NMN$90.00
REPLACE DAMAGED/UNREADABLE REGISTER$500.00
REPLACE DAMAGED/UNREADABLE REGISTER$500.00
Total Fees:$13,396.22
______  METER PAYMENT
______  T-POLE
______  SET 1 PD METER
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SLAB
______  SLAB
______  SLAB
______  SLAB
______  SLAB
______  SLAB
______  SLAB
______  SLAB
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  BRICK AND WALL TIES
______  INSULATION
______  WATER REGISTER
______  INSULATION
______  DRY WALL
______  DRY WALL
______  FLATWORK
______  FLATWORK
______  FLATWORK
______  GAS RELEASE
______  ELECTRICAL FINAL
______  GAS RELEASE
______  GAS RELEASE
______  GAS RELEASE
______  UTILITIES INSPECTION
______  UTILITIES INSPECTION
______  WATER REGISTER
______  UTILITIES INSPECTION
______  PLUMBMECHFINAL
______  UTILITIES INSPECTION
______  WATER REGISTER
______  PLUMBMECHFINAL
______  UTILITIES INSPECTION
______  PLUMBMECHFINAL
______  UTILITIES INSPECTION
______  CO AND BUILDING FINAL
______  CO AND BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)