Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 1/31/2018 PERMIT SUB-TYPE: SNEW PERMIT NO: B18-00481
JOB ADDRESS:
7852 HACKAMORE ST
FRISCO, TX
DESC:   4146 AC, 5073 SF, SFR / 2 STORY
OWNER:
CALATLANTIC HOMES OF TEXAS INC

FRISCO TX 75034-6015

CONTRACTOR:
LENNAR HOMES
14638 PENSHAM DR
FRISCO TX 75034
ISSUED DATE:
2/15/2018
APPLIED DATE:
1/16/2018
EXPIRED DATE:
8/4/2019
SITE APN:
D677617
STATUS:
COMPLETED
APPLICANT:
CALATLANTIC HOMES

IRVING TX 75039
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
309333.06
FEE SUMMARY
INSPECTION SUMMARY
PLUMBTOPOUT/MECHRGH 07/03/2018 CK$30.00
RESIDENTIAL BUILDING PERMIT FEE$2,043.75
FENCE FEE$20.00
RESIDENTIAL FEE$152.19
MISCELLANEOUS PLUMBING FEES$298.00
MISCELLANOUS MECHANICAL FEES$152.50
THOROUGHFARE IMPACT FEE$3,816.00
SEWER IMPACT FEE$0.00
WATER IMPACT FEE$1,772.00
CREDIT CARD FEE$1.20
CREDIT CARD FEE$11.80
CREDIT CARD FEE$1.60
1 INCH PD METER$410.00
WATER METER DEPOSIT$125.00
PLUMBTOPOUT/MECHRGH 06/26/2018 MLM$30.00
UTILITIES INSPECTION 12/17/2018 NMN$80.00
UTILITIES INSPECTION 01/04/2019 NMN$80.00
REPLACE DAMAGED/UNREADABLE REGISTER$500.00
REPLACEMENT CARD FEE$10.00
Total Fees:$9,534.04
______  METER PAYMENT
______  T-POLE
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  SLAB
______  SLAB
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  2NDS/FRAMING
______  2NDS/FRAMING
______  2NDS/FRAMING
______  BRICK/WALL TIES
______  INSULATION
______  DRY WALL
______  FLATWORK
______  ELECTRICAL FINAL
______  GAS RELEASE
______  SLAB
______  WATER REGISTER
______  UTILITIES INSPECTION
______  UTILITIES INSPECTION
______  FLATWORK
______  UTILITIES INSPECTION
______  PLUMBMECHFINAL
______  PLUMBMECHFINAL
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)